You’re Invited to Come Celebrate National Public Works Week In Mississauga!

By Events

The City of Mississauga’s public works professionals play an essential role in keeping us safe by building and maintaining the infrastructure, facilities and services we use and rely on everyday including roads, sidewalks, bike lanes, transit stops and stormwater infrastructure.

n Saturday, May 27, the City is celebrating these professionals and recognizing the important work they do with the return of its National Public Works Week Family Fun Day – and you’re invited!As part of National Public Works Week (May 21-27, 2023), Family Fun Day provides you with an opportunity to meet City staff and learn more about their work through a variety of interactive family-friendly activities. Get up close to the equipment and trucks and join in on fun, educational activities.

What:
National Public Works Week Family Fun Day event

Event activities include:

  • Truck and equipment displays (e.g. snow plow, MiWay bus, front-end loader)
  • Interactive exhibits with fun and educational activities
  • Bouncy castle
  • BBQ in support of United Way

Where: 
Mississauga Celebration Square
300 City Centre Dr.
Mississauga

When:
Saturday, May 27, 2023
10 a.m. to 3 p.m.

Cost:
This event is free to attend. Registration is not required.

Consider leaving your car at home and taking MiWay. Plan your trip using our Trip Planner.

About Public Works in the City of Mississauga:

The City maintains 5,700 lane kilometres of roads, 2,420 kilometres of sidewalks, 51,000 catch basins, one thousand pedestrian crossings, more than three thousand bus stops as well as multi-use trails and cycling infrastructure. Throughout the year, the City also repairs potholes and roadway damage including residential streets and bike lanes, inspects and repairs sidewalks and sweeps streets.

For more information about public works in the City, visit mississauga.ca/services-and-programs/transportation-and-streets/.

 Photos taken from the City’s last National Public Works Week Family Fun Day event in 2019 at Mississauga Celebration Square

Temporary Road Closure of Mineola Road West and East – West Closure: Saturday June 3, 2023. East Closure: Sunday June 4, 2023.

By Hurontario LRT, Ward 1

The LRT contractor is installing water utilities at the intersection of Mineola Road West/Mineola Road East and Hurontario Street.  The works will be done in stages as follows:

Mineola Road West Closure at Hurontario Street:

  • On Saturday June 3rd, Mineola Road West at Hurontario Street will be closed with a local detour provided for residents to access Mineola Road West using Indian Valley Trail and Glenburnie Road.  Works will occur between 7 am and 10 pm
  • During the closure, motorists (including Emergency Services) will not be able to travel west on Mineola Road West or to access Hurontario Street from Mineola Road West on Saturday June 3rd, 2023.
  • Pedestrian access will be maintained on Mineola Road West but motorists will be required to detour to/from the area using Indian Valley Trail and Glenburnie Road

Mineola Road East Closure at Hurontario Street:

  • On Sunday June 4th, Mineola Road East at Hurontario Street will be closed with a local detour provided for residents to access Mineola Road East using Pinewood Trail and Goldthorpe Road
  • During the closure, motorists (including Emergency Services) will not be able to travel east on Mineola Road East or to access Hurontario Street from Mineola Road East on Sunday June 4th, 2023.
  • Pedestrian access will be maintained on Mineola Road East but motorists will be required to detour to/from the area using Goldthorpe Road and Pinewood Trail.

Traffic flow will be maintained along Hurontario Street at all times.

Variable Message Signs have been installed advising motorists of the planned closures and a public notice has been delivered to the area advising of the upcoming temporary road closure (below).

Please note that the LRT constructor has been approved to work between 7 am and 10 pm on Saturday and Sunday June 3 and 4th, to reduce the overall duration of the Mineola Road West and East closures.

 

What work is taking place?

As utility upgrades progress in the area, crews will be connecting the newly installed watermain infrastructure along the west and east side of Hurontario Street at Mineola Road. The working hours will take place on Saturday June 3 and Sunday June 4 from 7 a.m. to 10 p.m. This work will occur in two phases. The first phase will involve the full closure of Mineola Road on the west side of Hurontario Street to complete the new watermain connection there. The second phase will involve the full closure of Mineola Road on the east side of Hurontario Street, once the west side reopens, to complete the new watermain connection there. Work is being scheduled at this time to minimize traffic and overnight noise impacts to nearby residents.

In accordance with City of Mississauga Noise By-Law Exemption requirements, this notice is meant to advise that residents near the work site can expect to hear noise and vibration caused by trucks, excavators, backhoes, loaders, and other construction equipment related to this work.

Please note, work may be rescheduled due to inclement weather or unforeseen circumstances. If you require the most up-to-date information, please reach out to peel@metrolinx.com.

TIMING

• Work is scheduled on the west side of Hurontario Street at Mineola Road West for Saturday June 3, 2023, from 7 am to 10 pm.

• Work is scheduled on the east side of Hurontario Street at Mineola Road East for Saturday June 4, 2023, from 7 am to 10 pm.

• Both sides of Mineola Road will not be closed at the same time

• Work could be rescheduled and delayed due to weather conditions or unforeseen circumstances.

TRAFFIC DETAILS

• Temporary lane reductions will be required on Hurontario Street.

• Access to Mineola Road West from Hurontario Street will be available from Indian Valley Trail and Glenburnie Road.

• Access to Mineola Road East from Hurontario Street will be available from Pinewood Trail and Goldthorpe Road.

• Access to emergency services will not be maintained for each closure. A paid duty police officer will be present during working hours to help control traffic flows at the intersection.

• Traffic delays are expected.

• Watch for slow moving vehicles entering and exiting work areas.

• Remember to reduce your speed when approaching lane reductions.

WHAT TO EXPECT?

• Every effort will be made to minimize disruptions.

• Residents and businesses near the work site can expect to hear noise and vibration caused by trucks, excavators, loaders, triaxles, backhoes, and other construction equipment related to this work.

TRANSIT DETAILS

• MiWay will continue to operate with regular service.

• Watch for additional signs directing passengers at bus stops as boarding areas may be relocated.

• Visit www.miway.ca/updates for updates on your bus route.

PEDESTRIAN DETAILS

• Please take care when travelling near construction areas.

• Sidewalk access in the area could be affected.

• Watch for additional signs directing pedestrians as detours may be required.

• Clear and defined walking paths will be maintained during construction to ensure pedestrian safety.

CONTACT US

• Metrolinx has a dedicated community relations team in place to work with residents in Peel region through the construction and operation of this transformational transit project.

24-hour line 416-202-7500.

Write to us at: peel@metrolinx.com
Find us on Twitter @HurontarioLRT
Visit the website and sign up for our newsletter: www.metrolinx.com/hurontariolrt

Lakeview Discovery Centre Artist-In-Residence Series – Final Community Art Workshop May 31, 4-7 pm

By Events, Ward 1

Please join the final community art workshop at Lakeview Village, Mississauga that is part of The Discovery Centre Artist-In-Residence Series, on May 31st (4pm-7pm), in partnership with Artscape Atelier.

This workshop is led by an Indigenous artists Pandora Wilhelm, who will be sharing her knowledge and creating language puzzles with participants to celebrate the many diverse languages spoken by families in the community. This workshop is geared to families (children recommended age 12 and younger) with their adult caregivers.

Eventbrite link for signing up: https://bit.ly/4369ii4

Instagram: HERE

Facebook: HERE

Public Meeting – Planning and Development Committee – 1407 Lakeshore Road East, north of Lakeshore Road East, east of Cherriebell Road

By Planning & Development, Ward 1

In Person and Virtual Public Meeting
RECOMMENDATION REPORT NOTICE

Meeting Date and Time:
Monday, June 12, 2023 at 6:00 p.m.
Meeting Place:
Mississauga Civic Centre, Council Chamber, 300 City Centre Drive
Applicant’s Proposal:
1407 Lakeshore Road East, north of Lakeshore Road East, east of Cherriebell Road
Application submitted by: 1407 Lakeshore Developments Inc.
File: OZ/OPA 22-13 W1

The applicant is proposing to change the official plan and zoning to permit a 9 storey apartment building with ground floor commercial space.

Meeting Details:

This meeting will be held in person and online. Advance registration is required to make a verbal submission at the meeting virtually. Advance registration is preferred to make a verbal submission at the meeting in person. The proceedings will be streamed live online for the public to view at the following link: http://www.mississauga.ca/portal/cityhall/council-and-committee-videos. If you wish to phone in to listen to the meeting only, please call 905-615-3200, ext. 5423 for instructions.

Options for participating in the meetings are outlined below.

Purpose of Meeting:
The City held a Public Meeting on August 8, 2022. At the upcoming meeting, Planning and Building staff will present a report addressing issues raised and will provide a recommendation on the proposal. Planning and Development Committee will make a decision about this project at this meeting.
The report will be available on-line one week prior to the meeting at: http://www.mississauga.ca/portal/cityhall/planninganddevelopment

For detailed information contact:
City Planner David Ferro at 905-615-3200 ext. 4554 or david.ferro@mississauga.ca

If you would like to share your views and/or you wish to be notified of further meetings or be added to the mailing list, please contact the Planning and Building Department by Friday at 4:00 p.m. prior to the meeting date:
• by mail to 300 City Centre Drive, 6th floor, Mississauga ON L5B 3C1
• by email to application.info@mississauga.ca
• please include your name, your address, and application number or address of the property you are providing comments on.

Written Comments:
In order to be received by Committee at the public meeting, written comments must be received no later than Friday at 4:00 p.m. prior to the meeting date. Submissions are accepted by email at deputations.presentations@mississauga.ca or by mailing the Planning and Development Committee, 300 City Centre Drive, 2nd Floor, Mississauga, ON L5B 3C1. Please include your name, your address, and application number or address of the property you are providing comments on. Written comments received before, during or after a public meeting but before a by-law is passed receive the same consideration as verbal comments made during a public meeting.

How to participate in a public meeting if you wish to make verbal submissions:

Participate Virtually
Advance registration is required to participate and/or make comment virtually at the public meeting. Please email deputations.presentations@mississauga.ca no later than Friday at 4:00 p.m. prior to the meeting date. Any materials you wish to show the Committee during your presentation must be provided as an attachment to the email. Links to cloud services will not be accepted. You will be provided with directions on how to participate from Clerks’ staff.

Residents without access to the internet can participate and/or make comment in the meeting via telephone. To register, please call Angie Melo at 905-615-3200 ext. 5423 no later than Friday at 4:00 p.m. prior to the meeting date. You must provide your name, phone number, and application number if you wish to speak to the Committee. You will be provided with directions on how to participate from Clerks’ staff.

Participate In Person
To make a verbal submission in person, advance registration is preferred. Please email deputations.presentations@mississauga.ca no later than Friday at 4:00 p.m. prior to the meeting date.

If you are a landlord, please post a copy of this notice where your tenants can see it. We want to make sure they have a chance to take part.

Background Studies:
Planning documents and background material available at: http://www.mississauga.ca/portal/residents/development-applications.
Contact the city planner noted above for more information.

Personal Information:
Individuals should be aware that any personal information in their verbal or written communication will become part of the public record, unless the individual expressly requests the City to remove the personal information. Questions about the collection of this information may be directed to application.info@mississauga.ca or in writing to the Planning and Building Department at 300 City Centre Drive, Mississauga ON L5B 3C1.

Information about Appeals:
If a person or public body does not make oral submissions at a public meeting or make written submissions to the City before the by-law is passed, the person or public body is not entitled to appeal the decision of City Council to the Ontario Land Tribunal, or be added as a party to an appeal of the decision to the Tribunal.

The proposed Official Plan amendment is exempt from approval by the Region of Peel. The decision of City Council is final if a notice of appeal is not received on or before the last day for filing a notice of appeal.

Date of Notice: May 18, 2023

Our City, Our Future: Province Grants Mississauga’s Request for Independence – May 18, 2023

By Announcement
On May 18, 2023, the Government of Ontario announced its decision to dissolve the Peel Region and make Mississauga, Brampton and Caledon independent, single-tier cities. For many decades, the Cities of Mississauga and Brampton and the Town of Caledon have operated within a regional governance model. This announcement follows many years of advocacy by Mississauga, and will give the City greater control over its decision-making and the ability to focus on its own priorities.In February, Mississauga City Council unanimously passed a resolution reaffirming its desire to be a stand-alone, single-tier municipality and to separate from the Peel Region. On May 18, 2023, the province announced that a Transition Board will be appointed to facilitate the dissolution of the Peel Region, with all changes made by January 1, 2025. More details on the transition will be available in the days and weeks ahead.

Since the 1990s, Mississauga has been advocating to leave the Region of Peel. In 2005, former Mayor Hazel McCallion and Council advocated to the province to do so and were not successful. The same advocacy occurred in 2019 with the same result.

The City of Mississauga is pleased with the announcement from the province. It reflects years of advocacy by Mississauga for independence and a recognition that our city is ready to stand on its own and make its own decisions. We will work collaboratively with the province, the newly appointed Transition Board, and our partners at the Peel Region, City of Brampton and Town of Caledon to ensure the dissolution of the Peel Region is executed properly and that no one is left behind or out of pocket. While the announcement is positive, there is a great deal of work left to do in the months ahead. We are committed to ensuring the continuity of frontline and essential services across the Peel Region. Council and staff will work together to make sure Mississauga’s interests are protected and that the transition to an independent Mississauga is smooth and seamless.

There are many reasons Mississauga supports separation, but here are the main ones:

  • Saving taxpayers money, up to $1 billion over a decade (Source: 2019 EY Report)
  • Less duplication and greater efficiency in the delivery of programs and services to residents
  • Mississauga property tax dollars should be invested in Mississauga and on our priorities
  • Eliminating a layer of government
  • Making our own decisions, without having to ask permission from other municipalities
  • Building housing more quickly to reach our provincial housing target
  • Mississauga residents and taxpayers have been carrying the costs of the region for 50 years
  • An independent Mississauga will help reduce confusion for residents over “who does what” and will be more efficient as duplication with the Peel Region will be eliminated.

The financial analysis has always supported separation:

    • In 2005, financial analysis by Day and Day showed the City would save over $32 million per year through separation
    • In 2019, a report by EY showed Mississauga residents are over-contributing to the Peel Region by $84 million per year. Through separation, residents could save almost $1 billion over the next decade
    • This money belongs in Mississauga and should be invested in our city and our residents.
    • Mississauga has a strong track record of financial management, receiving a Triple A credit rating for 19 straight years. We are ready and capable of managing our own affairs.

How Will Separation Work?

Council and City staff will work with the province and our neighbours to ensure an orderly dissolution of the Region. Our commitment is that there will be no disruption in service during the separation process. Your garbage will still be picked up, our buses will still run on time and first responders will continue to respond to calls. Continuity of service is important, and we will notify all residents and businesses before any changes are made. Many of the other services provided by the Region can be absorbed in the City of Mississauga on a per-capita basis. Most other cities in Ontario handle all programs and services in their city and we can too.

For services, such as Peel Police and Paramedics, discussions will be had to determine how best they can be delivered under the new governance model. It is too early to make commitments but residents should be rest assured that they will still have access to quality police and ambulance services throughout this process.

More details and information will be available in the coming days, weeks and months as we work through this transition.

Visit http://www.mississauga.ca/ourcityourfuture to stay up to date.

To learn more about the vibrant City of Mississauga, watch this video.

 

Mississauga Begins Another Busy Construction Season

By Resources

The City of Mississauga’s construction season is underway with important projects to repair, maintain and expand Mississauga’s transportation and stormwater infrastructure. This work will help reduce the risk of flooding and keep residents moving safely on roads, sidewalks, multi-use trails and cycling infrastructure. This year, there are 21 new projects with an estimated budget of $136.4 million and five projects continuing from 2022.

“As Mississauga continues to grow and mature, ongoing investments in our infrastructure are essential to keeping you moving safely and efficiently through the city and protecting homes and businesses from intense rainfall and flooding,” said Mayor Bonnie Crombie. “I want to thank residents for their patience as this essential work is completed. A big thank you to the City staff and crews who ensure this work is done with minimal disruption to residents and businesses.”

Construction projects within the City’s Roads and Stormwater Capital Programs include road resurfacing, sidewalk and multi-use trail construction and bridge repairs. Construction projects also include erosion control work along creeks, dredging and maintenance of stormwater management ponds and facilities as well as maintaining the City’s stormwater infrastructure.

“Our 2022 construction season delivered concrete results and this year will be no different. Our main priorities, especially on our roadways, is the safety of the travelling public, limiting delays and ensuring residents can move as they choose, whether its by foot, bike, transit, mobility device or vehicle,” said Geoff Wright, Commissioner, Transportation and Works. “One of our major projects will be taking place along The Collegeway, from Winston Churchill Boulevard to Mississauga Road. This project will include pavement rehabilitation, intersection improvements, new traffic signals and street lights, repairs to curbs, sidewalks and catch basins as well as the installation of cycle tracks from Winston Churchill Boulevard to South Millway.”

Residents can use the online construction map to find out what kind of construction projects are happening in their neighbourhood or along their commute, as well as who to contact if they have any questions. The construction map also provides information about City parks projects and projects from the Region of Peel, Ministry of Transportation and Alectra.

The City’s Field Ambassador Program is another way that Mississauga residents and business owners can stay informed about the work being done. Those who want to learn more about construction happening along their street can connect with the Field Ambassador to have their questions answered and prepare for any potential disruptions.

Construction Continues on Metrolinx’s Hurontario Light Rail Transit (HuLRT) Project
Residents and commuters will also continue to see major construction continuing on the Hurontario corridor between the Port Credit GO Station and Highway 407. For the latest updates, visit metrolinx.com/hazelmccallionline.

Controlling Pests on Construction Sites
The City will continue to effectively control pests through its Construction Pest Control Program. All construction projects will be assessed on a project-by-project basis to ensure the necessary pest control measures are implemented. The City’s program aligns with the Region of Peel’s Rat Control Subsidy Pilot Program, which has been extended to help residents with managing rat issues around the outside of their homes.

Ongoing Spring Maintenance
Ongoing spring maintenance and cleanup also continues to maintain the City’s 5,700 kilometres of roads, including filling potholes, sweeping streets, repairing sidewalks and sod damaged by winter operations and clearing litter and debris.

With all of this ongoing work, residents are reminded to be cautious when travelling near construction sites, adhere to all site signs and barricades and to please be respectful and give crews space as they work.

For more information:

  • Call 311 (905-615-4311 if outside city limits) for general inquiries about construction in Mississauga.
  • For questions specific to construction work happening on your street, connect with the City’s Field Ambassador by email at Capital.FieldAmbassador@mississauga.ca.
  • Visit mississauga.ca/construction to access the construction map and learn more about Mississauga construction projects.
  • Follow the Hurontario LRT Facebook and Twitter accounts for construction updates.

More information about the construction projects planned for 2023.

 

Shop local at Mississauga’s only indoor and outdoor farmers’ Market! Sundays – May 28-October 29

By Events, Ward 1

The Lakeview Farmers’ Market is held indoors and outdoors at the Small Arms Inspection Building, with live music from local buskers, a cafe, a bi-weekly Artisan Market, special community activities, and much more.

The Lakeview Farmers’ Market features local, sustainable, organic, and artisanal products, which provide an important source of income for local farmers, growers, producers, and artisans. Take the opportunity to connect with those who grow and produce the food that ends up on your plate! 

Check back weekly for details on additional Market activities and vendor lineups. https://www.creativehub1352.ca/lakeviewfarmersmarket 

Lakeview Innovation District Community Improvement Plan (CIP) – Survey Results

By Planning & Development, Ward 1

What We Heard
Two surveys, one for residents and one for industry, were open from April 4 to 21, 2023 on the
Lakeview Innovation District CIP website (https://yoursay.mississauga.ca/lakeview-innovation-district).

The surveys aimed to gather feedback on providing incentives to industries locating in the Innovation
District.

For full survey results, click here.

Next Steps
The survey results were considered in preparing the draft CIP that will be presented for comment. The following steps are required to adopt and activate the CIP:

• May 29, 2023 – Planning and Development Committee Public Meeting to consider the draft CIP

This meeting will be held in person and online.
Advance registration is required to participate and/or make a comment at the meeting virtually.
Advance registration is preferred to participate and/or make a comment in the meeting inperson. To register, please email deputations.presentations@mississauga.ca or call 905-615-
3200 ext. 4915 no later than the Friday prior to the meeting.
The proceedings will be streamed live online for the public to view at the following link:
http://www.mississauga.ca/portal/cityhall/council-and-committee-videos.
• June 14, 2023 – City Council meeting to adopt a By-law to implement the CIP
• 20-day appeal period
• CIP in force and effect after appeal period and resolution of any appeals, if applicable

Comments and feedback are invited at the Public Meeting (registration details above) as well as anytime prior to City Council adoption of the CIP by contacting:

Melissa Slupik, Project Lead
Planner, Planning Innovation, City Planning Strategies
Phone 1-905-615-3200 x 5152
Email melissa.slupik@mississauga.ca
Mail Melissa Slupik, City Planning Strategies, 7th FL – Planning and Building, City of Mississauga, 300 City Centre Drive, Mississauga, ON L5B 3C1

SCHEDULED WATER INTERRUPTION NOTICE – May 24 – 14 Front St S, Mississauga

By Resources, Ward 1

INTERRUPTION DETAILS

Date and Time:         Wednesday, May 24th, 2023, from 09:00 a.m. to 05:00 p.m

Location:                    14 Front St S, Mississauga              

Addresses Affected10-42 Front St South

Project #:                   C-602991

Regional Inspector:  John Sedore

Telephone #               905-791-7800 ext. 3246/3247

The Region of Peel Public Works department regularly maintains and repairs the water system to make sure you have a consistent supply of quality drinking water. Sometimes we must turn off your water supply while we do this work.

Your water will be turned off on Wednesday, May 24th, 2023, from approximately 09:00 a.m. to 05:00 p.m. If we need to reschedule this work due to weather or other circumstances, we will let you know the new date and time.

If this interruption may affect an alarm or maintenance company, it is your responsibility to notify them.  During the time that the water supply is interrupted, the building’s sprinkler protection system will not function.  A fire watch should be performed as necessary during time.

After the water interruption:

When we turn the water back on, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise.  We recommend removing the air by slowly turning on your taps from the lowest to the highest faucet in the building (that is, starting in the basement/first floor and finishing on the top floor). Flush the toilets as well. You will likely need to run the water for 10 to 30 seconds.  Run the water until it is clear, and any vibration or noise has stopped.

Important note:  After the water is turned back on, we recommend checking your water meter (usually located in the basement).  If it is leaking, call Water Meter Installations Dispatch at:

  • (905) 791 – 7800 Ext. 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
  • (905) 791 – 7800 Ext. 4409 (After hours or Statutory Holidays)

 

SCHEDULED WATER INTERRUPTION NOTICE – May 25 – 1279 Alexandra Avenue, Mississauga

By Resources, Ward 1

INTERRUPTION DETAILS

Date and Time:         Thursday, May 25th, 2023, from 09:00 a.m. to 05:00 p.m.

Location:                    1279 Alexandra Avenue, Mississauga                    

Addresses Affected1302-1255 Alexandra Avenue

Project #:                   C-603233

Regional Inspector:  John Sedore

Telephone #               905-791-7800 ext. 3246/3247

 

The Region of Peel Public Works department regularly maintains and repairs the water system to make sure you have a consistent supply of quality drinking water. Sometimes we must turn off your water supply while we do this work.

Your water will be turned off on Thursday, May 25th, 2023, from approximately 09:00 a.m. to 05:00 p.m.  If we need to reschedule this work due to weather or other circumstances, we will let you know the new date and time.

If this interruption may affect an alarm or maintenance company, it is your responsibility to notify them.  During the time that the water supply is interrupted, the building’s sprinkler protection system will not function.  A fire watch should be performed as necessary during time.

After the water interruption:

When we turn the water back on, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise.  We recommend removing the air by slowly turning on your taps from the lowest to the highest faucet in the building (that is, starting in the basement/first floor and finishing on the top floor). Flush the toilets as well. You will likely need to run the water for 10 to 30 seconds.  Run the water until it is clear, and any vibration or noise has stopped.

Important note:  After the water is turned back on, we recommend checking your water meter (usually located in the basement).  If it is leaking, call Water Meter Installations Dispatch at:

  • (905) 791 – 7800 Ext. 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
  • (905) 791 – 7800 Ext. 4409 (After hours or Statutory Holidays)