SCHEDULED WATER SUPPLY TEST SHUTDOWN – January 28, 2022

By January 26, 2022January 27th, 2022Issues, Resources, Ward 1

INTERRUPTION DETAILS

Date: Friday January 28, 2022

Time: Brief interruptions between 10:00 a.m. to 11:00 a.m.

Location: Revus Avenue

Affecting:

360 & 366 Revus Avenue
376 to 401 Revus Avenue

Dear Customer:

The Region of Peel Public Works department regularly maintains and repairs the water system to make sure you have a reliable supply of quality drinking water. Sometimes we must turn off your water supply while we do the work. There may be some water pressure losses and brief water interruptions (15 minutes) on Friday, January 28 between 10 a.m. and 11 a.m. while we work in your area.

If this interruption may affect an alarm or maintenance company, it is your responsibility to notify them.
After our test shutdown is complete, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise. If this happens, you can remove the air by briefly turning on your taps from the lowest to the highest faucet in the building (that is, starting in the basement/first floor, and finishing on the top floor). Flush the toilets as well.
You should only have to run the water for 10 to 30 seconds, but keep running it until the water is clear and any vibration or noise has stopped.

If your water meter starts to leak, call Water Meter Installations Dispatch at:
• (905) 791 – 7800 Ext. 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
• (905) 791 – 7800 Ext. 4409 (After hours or Statutory Holidays)