Resources

SCHEDULED WATER INTERRUPTION NOTICE – Wednesday, June 21, 2023 – 298-380 Lakeshore Road W, 3-10 Benson Ave

By Resources, Ward 1

INTERRUPTION DETAILS

Date and Time:         Wednesday, June 21, 2023, from 8:00 a.m. to 10:00 a.m.

Location:                    Lakeshore Road W and Benson Ave                               

Addresses Affected:  298-380 Lakeshore Road W, 3-10 Benson Ave

Project #:                   T-17004Ma

Regional Inspector:  John Sedore

Telephone #               416-706-1114 Ext 3246/47

The Region of Peel Public Works department regularly maintains and repairs the water system to make sure you have a consistent supply of quality drinking water. Sometimes we must turn off your water supply while we do this work.

Your water will be turned off on Wednesday, June 21, 2023, from approximately 8:00 a.m. to 10:00 a.m. If we need to reschedule this work due to weather or other circumstances, we will let you know the new date and time.

If this interruption may affect an alarm or maintenance company, it is your responsibility to notify them.  During the time that the water supply is interrupted, the building’s sprinkler protection system will not function.  A fire watch should be performed as necessary during time period.

After the water interruption:

When we turn the water back on, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise.  We recommend removing the air by slowly turning on your taps from the lowest to the highest faucet in the building (that is, starting in the basement/first floor and finishing on the top floor). Flush the toilets as well. You will likely need to run the water for 10 to 30 seconds.  Run the water until it is clear, and any vibration or noise has stopped.

Important note:  After the water is turned back on, we recommend checking your water meter (usually located in the basement).  If it is leaking, call Water Meter Installations Dispatch at:

  • (905) 791 – 7800 Ext. 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
  • (905) 791 – 7800 Ext. 4409 (After hours or Statutory Holidays)

 

Notice of Bus Stop Impact: #0331 – SB Hurontario St at Indian Valley Trail | Wednesday, June 14, 2023

By Hurontario LRT, Resources

Please be advised of the following stop impacts. See the related details below:

Stop(s) Impacted:  No.: 0331: SB Hurontario St at Indian Valley Trail

Temporary Stop Location:

0305 – Hurontario St South Of Indian Valley Trail (195m south)

0329 – Hurontario St at Pinetree Way (315m north)

Routes Impacted: 2 South

Date and Time: Wednesday, June 14, 2023 @ 7:00am

Estimated Duration: until Thursday, June 22, 2023 @ 7:00am

Event Type: HuLRT

Agency: Mobilinx

Notes:

–             Stops will remain accessible;

–             No detours required.

Should there be any questions/concerns, please contact: MiWay.Infrastructure@mississauga.ca.

SCHEDULED WATER INTERRUPTION NOTICE – June 13 – 1155 W Shore Drive

By Resources, Ward 1

INTERRUPTION DETAILS

Date and Time:  Tuesday, June 13th, 2023, from 9:00 a.m. to 5:00 p.m.

Location:  1155 W Shore Drive                              

Addresses Affected833 Fourth St, 1151-1185 West Shore Dr, 830 Village Green Blvd

Project #:                   C-603218

Regional InspectorJohn Sedore

Telephone # 416-706-1114 Ext 3246/47

The Region of Peel Public Works department regularly maintains and repairs the water system to make sure you have a consistent supply of quality drinking water. Sometimes we must turn off your water supply while we do this work.

Your water will be turned off on Tuesday, June 13th, 2023, from approximately 9:00 a.m. to 5:00 p.m. If we need to reschedule this work due to weather or other circumstances, we will let you know the new date and time.

If this interruption may affect an alarm or maintenance company, it is your responsibility to notify them.  During the time that the water supply is interrupted, the building’s sprinkler protection system will not function.  A fire watch should be performed as necessary during time period.

After the water interruption:

When we turn the water back on, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise.  We recommend removing the air by slowly turning on your taps from the lowest to the highest faucet in the building (that is, starting in the basement/first floor and finishing on the top floor). Flush the toilets as well. You will likely need to run the water for 10 to 30 seconds.  Run the water until it is clear, and any vibration or noise has stopped.

Important note:  After the water is turned back on, we recommend checking your water meter (usually located in the basement).  If it is leaking, call Water Meter Installations Dispatch at:

  • (905) 791 – 7800 Ext. 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
  • (905) 791 – 7800 Ext. 4409 (After hours or Statutory Holidays)

Shaun Hussain

Foreperson, Construction Inspections

Engineering Technical Services

Operations Support Division

Public Works

2 Copper Road, Brampton ON, L6T 4W5

(905) 791-7800 Ext. 3309

SCHEDULED WATER INTERRUPTION NOTICE – June 14 – 1552 Haig Boulevard

By Resources, Ward 1

INTERRUPTION DETAILS

Date and Time:  Wednesday, June 14th, 2023, from 9:00 a.m. to 5:00 p.m.

Location:  1552 Haig Boulevard                                   

Addresses Affected1541-1590 Haig Blvd

Project #:                   C-602790

Regional InspectorJohn Sedore

Telephone #  416-706-1114 Ext 3246/47

The Region of Peel Public Works department regularly maintains and repairs the water system to make sure you have a consistent supply of quality drinking water. Sometimes we must turn off your water supply while we do this work.

Your water will be turned off on Wednesday, June 14th, 2023, from approximately 9:00 a.m. to 5:00 p.m. If we need to reschedule this work due to weather or other circumstances, we will let you know the new date and time.

If this interruption may affect an alarm or maintenance company, it is your responsibility to notify them.  During the time that the water supply is interrupted, the building’s sprinkler protection system will not function.  A fire watch should be performed as necessary during time period.

After the water interruption:

When we turn the water back on, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise.  We recommend removing the air by slowly turning on your taps from the lowest to the highest faucet in the building (that is, starting in the basement/first floor and finishing on the top floor). Flush the toilets as well. You will likely need to run the water for 10 to 30 seconds.  Run the water until it is clear, and any vibration or noise has stopped.

Important note:  After the water is turned back on, we recommend checking your water meter (usually located in the basement).  If it is leaking, call Water Meter Installations Dispatch at:

  • (905) 791 – 7800 Ext. 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
  • (905) 791 – 7800 Ext. 4409 (After hours or Statutory Holidays)

Shaun Hussain

Foreperson, Construction Inspections

Engineering Technical Services

Operations Support Division

Public Works

2 Copper Road, Brampton ON, L6T 4W5

(905) 791-7800 Ext. 3309

WATER INTERRUPTION NOTICE Watermain Replacement and Improvement – June 8 – 20 Mineola Road East and 1262, 1276, 1288, 1290, 1300 and 1312 Hurontario Street

By Resources, Ward 1

INTERRUPTION DETAILS

Date: Thursday June 8th, 2023

Time: 9:00 am. to 10:00 a.m.

Location: 20 Mineola Road East and 1262, 1276, 1288, 1290, 1300 and 1312 Hurontario Street

Affecting: Approximately 1 Townhouse Complex (20 homes) and 6 Commercial Units affected

Project No.: 16-1390

Project Manager: Jay Christy

Telephone: (437)339-3945

The Region of Peel Public Works department regularly maintains and repairs the water system to make sure you have a consistent supply of quality drinking water. Sometimes we must turn off your water supply while we do this work.

Your water will be turned off on Thursday June 8th, 2023, between 9 a.m. and 10 a.m. If we need to reschedule this work due to weather or other circumstances, we will let you know the new date and time.

Property owner/manager responsibilities during a water interruption

As a property owner/manager, it is your responsibility to:
•Ensure maintenance, mechanical or plumbing staff are on site during the water interruption, as it may affect internal systems that rely on water such as boilers, fire suppression, and alarms.
•Notify the fire alarm company if the interruption could affect an alarm system.
•Have a fire watch completed during the water interruption, as the building’s sprinkler protection system will not function when the water supply is shut off.

After the water interruption
When we turn the water back on, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise. We recommend removing the air by slowly turning on your taps from the lowest to the highest faucet in the building (that is, starting in the basement/first floor, and finishing on the top floor). You will likely need to run the water for 10 to 30 seconds. Run the water until it is clear, and any vibration or noise has stopped.

Important note
After the water is turned back on, we recommend checking the water meter (usually located in the basement). If it is leaking, call Water Meter Installations Dispatch at:
•905-791-7800, extension 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
•905-791-7800 extension 4409 (after hours or statutory holidays)

Sign up for email notices
Receive timely project updates right to your inbox by signing up for e-notices at peelregion.ca/construction

Keeping you informed
We will let you know if there are any major changes to the plans.

Thank you for your patience as we complete this necessary work. This work will allow us to continue providing you with high quality tap water.

If you have any questions, please contact us.
Water Linear Engineering
Engineering Services Division
Public Works, Region of Peel
Email: construction@peelregion.ca
Phone: 905-791-7800 ext. 4409

NOTICE OF PUBLIC INFORMATION CENTRE NO. 3 – Port Credit East Water and Wastewater Servicing Optimization Strategy Schedule C Class Environmental Assessment

By Events, Resources, Ward 1

Background:
The existing sanitary pumping stations (SPS): Elmwood, Hiawatha and Rosemere and some of the sanitary sewer mains and watermains in the general Port Credit East area are experiencing operational challenges.

The Region of Peel initiated this Municipal Class Environmental Assessment (EA) to develop an integrated and optimized servicing strategy to meet the needs of the existing community and provide for future growth (Figure 1).

Your Input is Important
You are invited to an in-person Public Information Centre (PIC) No. 3 to learn more about the study and to give feedback to the project team. All content and instructions on how to submit questions and feedback on this material will be posted on the project website. Access the website using the link below or by scanning the QR code with your smartphone: https://www.peelregion.ca/public-works/environmental-assessments/mississauga/portcredit-east-wastewater.asp.

PIC No. 3:
This PIC will be presenting the preliminary preferred design concepts for the water and sanitary servicing strategies, which includes the following elements:
• New Deep Trunk Sewer on Lakeshore Road
• New Sub-Transmission Watermain on Lakeshore Road
• New Rosemere SPS and construction of associated Twinned Forcemains
• Decommissioning of Elmwood and Hiawatha SPS and construction of new Gravity Sewers

Date and Time: Wednesday, June 14, 2023 from 5:30 pm to 7:30 pm

Location: Clarke Memorial Hall – Main Hall | 161 Lakeshore Rd. W., Mississauga, ON, L5H 1G3

PIC No. 3 materials will be posted on the project website following the in-person PIC event. This will be followed by a two-week question submission period closing on June 28, 2023.

Contact:
If you wish to submit comments or would like to be added to the project mailing list for future project notifications, please contact the Project Manager listed here. The Region of Peel is committed to ensure that all regional services, programs, and facilities are inclusive and accessible. Please contact the Project Manager if you need accommodations to provide comments or feedback for this study.

Italia Ponce, P.Eng., Project Manager
10 Peel Centre Drive
Brampton, ON, L6T 4B9
905-791-7800 ext. 4583
Italia.ponce@peelregion.ca

This notice was first issued on June 1, 2023

With the exception of personal information, all comments will become part of the public record of the study. The study is being conducted according to the requirements of the Municipal Class Environmental Assessment, which is a planning process approved under Ontario’s Environmental Assessment Act.