PROJECT UPDATE Storm Sewer Rehabilitation Dixie Road at Blundell Road

By November 17, 2023Resources, Ward 1

Peel Region is working in your neighbourhood to rehabilitate the storm sewer on Dixie Road South of Dundas Street East. The City of Mississauga, under the Noise Bylaw, is allowing work to be done by our contractor throughout the day and overnight, to facilitate lining of the storm sewers. We apologize in advance for any inconveniences caused by this work.

Schedule

This overnight work is expected to take place two days from 7 a.m. November 21st until 7 a.m. November 23rd, 2023. Additional nights may be required due to unpredictable delays, such as poor weather conditions. Traffic impacts This work will require a lane closure of the northbound lane on Dixie Road South of Blundell Road. This lane closure will take place from 7 a.m. November 21st to 7 a.m. November 23rd, 2023. Signage will be available for detour route directions. Noise We do not anticipate significant noise or vibrations above normal daytime traffic levels during these operations. Efforts will be made to reduce impacts to residents as much as possible.

Safety during construction
Construction zones require extra caution to keep everyone safe – pedestrians, cyclists, drivers, and construction workers. When driving, walking, or biking through the construction area, please be aware of your surroundings, watch for construction crews and other road users, slow down, account for delays, and consider other routes if possible. To learn more about how to stay safe in construction zones, visit peelregion.ca/workzonesafety

Keeping you informed
We will let you know if there are any major changes to the plans.
Receive timely project updates right to your inbox by signing up for e-notices. Visit peelregion.ca/construction/signup or scan the QR code below (using your cell phone camera) to start signing up.

Follow Peel Public Works on Twitter (twitter.com/peelpublicworks) for project updates.
Information on this project can also be found at peelregion.ca/pw/construction/21-2300D.asp

Thank you for your patience as we complete this necessary work. This work will allow us to continue providing you with high quality storm water services. If you have any questions, please contact us.

Wastewater Collection and Conveyance
Engineering Services Division
Public Works, Peel Region
Email: construction@peelregion.ca