PRE-DESIGN FIELD INVESTIGATION – LAKESHORE CORRIDOR

By December 4, 2020Events, Issues, Resources

December 04, 2020

PRE-DESIGN FIELD INVESTIGATION

LAKESHORE CORRIDOR FROM JACK DARLING PARK TO ELMWOOD AVENUE

What are we doing?

  • Performing field investigation services along the Lakeshore Road corridor between Elmwood Avenue and Jack Darling Park.
  • Work involves utility stakeouts, boreholes, surveying and photographing assets in the project area as well as test pits to confirm utility locations.

Why?

  • To determine soil conditions and verify the location of existing underground and above ground utilities along the Lakeshore corridor for design and construction of future Regional infrastructure

When?

  • We expect to start work on or about December 14, 2020.
  • The project should be completed by December 31, 2021.

What to Expect

  • Minor traffic disruptions.
  • Working hours are Monday to Friday from 7am to 7pm.
  • There may be occasional Saturday work from 9:00 a.m. to 5:00 p.m.

Construction project updates can be found at peelregion.ca/construction .