Issues

Councillor Dasko Invites You to The Speaker Series on November 4th

By Events, Issues, Planning & Development, Resources, Ward 1

 

https://mississauga.webex.com/mississauga/j.php?MTID=mde8f023f6ae0af3705b87baca416ca30

This event is open for all to attend!

No registration is required to join the event.

The link above will be active on  November 4th at 6:30 p.m.

Click the link to sign in and join the meeting.

If assistance is required for signing into the Webex Meeting, please send me an email at stephen.dasko@mississauga.ca or call my office at (905) 896 – 5100.

RECOMMENDATION REPORT NOTICE – 1082 Lakeshore Road East and 800 Hydro Road

By Events, Issues, Planning & Development, Resources, Ward 1

In Person and Virtual Public Meeting
RECOMMENDATION REPORT NOTICE

1082 Lakeshore Road East and 800 Hydro Road
South side of Lakeshore Road East, east of Lakefront Promenade
Application submitted by: Lakeview Community Partners Limited
Files: OZ 19/003 W1, OZ 19/021 W1 and T-M19001 W1

OZ 19-003 W1 and OZ 19-021 W1 – Notice Read More

Peel 2051 Official Plan Public Consultations

By Events, Issues, Resources, Ward 1

Download the notice here.

Peel 2051 is the Region’s Official Plan Review and Municipal Comprehensive Review (MCR), which will help us better plan for the future by taking action on new population and employment forecasts, responding to public and stakeholder feedback, and complying with new provincial legislation, plans, and policies.

Open Houses

The Region will be conducting two Open Houses to provide members of the public an opportunity to learn about the proposed ROPA, ask staff questions, and provide comments:

Note that the same materials will be presented at each of these Open Houses. The virtual display boards for the Peel 2051 focus areas are available below. Read More

MiWay Service Changes

By Issues, Resources, Ward 1

MiWay will be implementing service changes on October 4 – ahead of the planned service changes on October 25 – to ensure that our on-street service continues to adapt and respond to customer needs and evolving travel patterns.

As students returned to in-person learning and traffic volumes increased in September, MiWay remains committed to monitoring ridership levels across the transit network.

The following service changes will launch on Monday, October 4, 2021:

  1. Adding more service where demand has increased
    Trips have been added on the following routes in response to growing demand on routes serving Mississauga secondary schools:
  • 2 Hurontario (serving Port Credit Secondary School)
  • 3 Bloor (serving Applewood Heights Secondary School)
  • 8 Cawthra (serving Cawthra Park Secondary School)
  • 13 Glen Erin (serving St. Aloysius Gonzaga and John Fraser Secondary School)
  • 23 Lakeshore (additional connecting trip servicing Port Credit Secondary School)
  • 26 Burnhamthorpe (serving Glenforest Secondary School)
  • 29 Park Royal-Homelands (serving Clarkson Secondary School)
  • 36 Colonial Ridgeway (serving Loyola Secondary School)
  • 39 Britannia (additional connecting trip)
  • 61 Mavis (serving St. Marcellinus Secondary School)

Read More

PARK STREET EAST BETWEEN ANN STREET AND HELENE STREET NORTH

By Events, Issues, Ward 1

—TEMPORARY ROAD CLOSURE NOTICE—

Please be advised that Park Street East between Ann Street and Helene Street North will be closed.

When: Monday, October 4th, 2021 from 9:00 am until 5:00 pm.

Where:  Park Street East between Ann Street and Helene Street North.

 Why:  Mobile crane will be staged on Park Street East in order to hoist struts to the new development at 28 Ann Street.

 

Let’s Walk and Roll! Make the Journey to School Fun, Safe and Active for Walk to School Month

By Events, Issues, Uncategorized, Ward 1

October 1, 2021

 In addition to Pedestrian Safety Month, October is also International Walk to School Month and the City of Mississauga is launching a Mississauga Walk to School Month online event. Throughout October, the event encourages all Mississauga students, their parents and guardians to leave their car at home and use active transportation to get to and from school or their designated bus stop. Active transportation includes walking, rollerblading or travelling by bike, scooter, skateboard, wheelchair or other mobility devices. With many students returning to in-person learning and residents and commuters returning to work, there is more congestion on Mississauga’s roads. Walking and rolling is a healthy and fun way to travel to school that contributes to safer streets and reduced traffic congestion in and around school zones.  The event also promotes staying safe by following road and trail rules.

Participating students or their parents or guardians are encouraged to keep track of the number of times they walk or roll to or from school or the bus stop. Students learning virtually can participate by tracking their walking or rolling trips, such as in their neighbourhood, through a local trail or to run errands with family. During the month of October, participants can download an online certificate to celebrate the number of trips they made, as well as share their accomplishment on social media using the hashtag #WalktoSchoolSauga.

Walk to School Month Event Details

What:

An online event to encourage Mississauga students and their parents or guardians to get to and from school using active transportation. The event also promotes staying safe by following road and trail rules.

Read More

Notice of Bus Stop Impacts: NB Hurontario St North of Mineola Rd E – Tuesday, September 28

By Hurontario LRT, Issues, Ward 1

Please be advised of the following stop impacts. See the related details below:

Stop(s) Impacted:

–        0304: Hurontario St North of Mineola Rd E

Alternate Stop Location:

–        0332: Hurontario St At Pinewood Trail – 196m North or 0334: Hurontario St At Mineola Rd E – 255m South.

Routes Impacted: 2N, 8N

Date and Time:  Effective Immediately

Estimated Duration: until Friday, October 1 @ 5:00pm

Event Type: Construction

Agency: Metrolinx (HuLRT)

Notes: Stops will remain accessible. No detours required. Expect delays due to lane closures.

 

Notice of CompletionDesign & Construction Report – QEW Improvements from East of Cawthra Rd to West of Etobicoke Creek

By Issues, Ward 1

September 29,2021

The Ontario Ministry of Transportation (MTO) has retained AECOM Canada Ltd. (AECOM) to undertake a Detail Design and Class Environmental Assessment (EA) for improvements to the Queen Elizabeth Way (QEW) from east of Cawthra Road to The East Mall. The project was split into two contracts. Construction of Contract 1 along the QEW  from east of Dixie Road to The East Mall commenced in September 2018 and is anticipated to be completed in Spring 2022. Contract 2 covers the works along QEW from east of Cawthra Road to west of Etobicoke Creek and is the focus of the Design and Construction Report (DCR) #2.

The proposed Detail Design improvements include:
• Replacement of the QEW / Dixie Road Underpass and reconfiguration of the QEW / Dixie
Road Interchange to a full-moves interchange including modifications to municipal roads;
• Replacement of the Ogden Pedestrian Bridge and structural culvert west of Dixie Road;
• Realignment of local service roads;
• Localized QEW widening to accommodate operational and safety improvements and to
maintain six lanes of traffic during construction;
• Drainage improvements including the addition of stormwater management ponds;
• Watermain and sanitary sewer works;
• Modifications to / installation of retaining walls, noise barriers, sign-structures, traffic signals
and illumination.

Read More