Hurontario LRT Construction Notice

Hurontario LRT Construction Notice
Information as of: March 2023
Temporary Road Closure of
Mineola Road West at Hurontario
Street for Stormwater Installation
Saturday April 15 from 7 a.m. to 10 p.m.
Contact Us:
Call us: 416-202-7500
Write to us at: peel@metrolinx.com
Find us on Twitter @HurontarioLRT
Visit the website and sign up for our newsletter: www.metrolinx.com/hurontariolrt
What work is taking place? As utility upgrades progress in the area, crews will be installing stormwater infrastructure along the west side of Hurontario Street at Mineola Drive West. The working hours will take place on Saturday April 15 from 7 a.m. to 10 p.m. This will involve the full closure of Mineola on the west side of Hurontario Street to accommodate the storm crossing. Work is being scheduled to minimize traffic and overnight noise impacts to nearby residents.
In accordance with City of Mississauga Noise By-Law Exemption requirements, this notice is meant to advise that residents near the work site can expect to hear noise and vibration caused by trucks, excavators, backhoes, loaders, and other construction equipment related to this work.
Please note, work may be rescheduled due to inclement weather or unforeseen circumstances. If you require the most up-to-date information, please reach out to peel@metrolinx.com.
TIMING • Work is scheduled for April 15, 2023, from 7 a.m. to 10 p.m. • Work could be rescheduled and delayed due to weather conditions or unforeseen circumstances.
TRAFFIC DETAILS • Temporary lane reductions will be required on Hurontario Street. • Access to Mineola Road West from Hurontario Street will be available from Indian Valley Trail and Glenburnie Road. • A paid duty police officer will be present during working hours to help control traffic flows at the intersection. • Traffic delays are expected. • Watch for slow moving vehicles entering and exiting work areas. • Remember to reduce your speed when approaching lane reductions.
WHAT TO EXPECT? • Every effort will be made to minimize disruptions. • Residents and businesses near the work site can expect to hear noise and vibration caused by trucks, excavators,
loaders, triaxles, backhoes, and other construction equipment related to this work.
TRANSIT DETAILS • MiWay will continue to operate with regular service. • Watch for additional signs directing passengers at bus stops as boarding areas may be relocated. • Visit www.miway.ca/updates for updates on your bus route.
PEDESTRIAN DETAILS • Please take care when travelling near construction areas. • Sidewalk access in the area could be affected. • Watch for additional signs directing pedestrians as detours may be required. • Clear and defined walking paths will be maintained during construction to ensure pedestrian safety.
CONTACT US • Metrolinx has a dedicated community relations team in place to work with residents in Peel region through the construction and operation of this transformational transit project. • 24-hour line 416-202-7500.