Construction Notice PROJECT UPDATE Storm Sewer Rehabilitation At Dixie Road and Dundas Street

By November 24, 2023Resources, Ward 1

Project 21-2300D

Peel Region is working in your neighbourhood to rehabilitate the storm sewer on Dixie Road at Dundas Street.
The City of Mississauga, under the Noise Bylaw, is allowing work to be done by our contractor overnight. This work will take place overnight to rehabilitate the storm sewer on Dixie Road and to minimize the impact of traffic congestion. We apologize in advance for any inconveniences caused by this work.

Schedule
This overnight work is expected to take place for one evening, November 27, 2023, from 7pm until 7am. Additional nights may be required due to unpredictable delays, such as poor weather conditions.

Traffic impacts
This work will require a lane closure of north bound Lane at Dixie Road south of Dundas Street from 7pm to 7am . Signage will be available for detour route directions.

Noise
We do not anticipate significant noise or vibrations above normal daytime traffic levels during these operations. Efforts will be made to reduce impacts to residents as much as possible.

Safety during construction
Construction zones require extra caution to keep everyone safe – pedestrians, cyclists, drivers, and construction workers. When driving, walking, or biking through the construction area, please be aware of your surroundings, watch for construction crews and other road users, slow down, account for delays, and consider other routes if possible. To learn more about how to stay safe in construction zones, visit peelregion.ca/workzonesafety

Keeping you informed
We will let you know if there are any major changes to the plans.
Follow Peel Public Works on Twitter (twitter.com/peelpublicworks) for project updates.
Information on this project can also be found at https://peelregion.ca/pw/construction/21-2300D.asp

Thank you for your patience as we complete this necessary work. This work will allow us to continue providing you with high quality Storm Water Services. If you have any questions, please contact us.

Wastewater Collection and Conveyance
Engineering Services Division
Public Works, Peel Region
Email: construction@peelregion.ca
Phone: 905-791-7800 ext. 4409