Peel Region will be doing maintenance work in your area on Primate Road at Dixie Road.
Some upcoming work will take place overnight, to drain, repair, and modify an existing watermain in the chamber.
This overnight work will occur at the Primate Road and Dixie Road intersection. We apologize in advance for any
inconveniences caused by this work.
Schedule
The City of Mississauga, under the Noise Bylaw, is allowing work to be done by our contractor overnight. This
overnight work is expected to take place for multiple evenings, from Monday, October 23, 2023, to Friday,
October 27, 2023, from 7:00 pm. till 7:00 am. Additional nights may be required due to unpredictable delays, such
as poor weather conditions.
Traffic impacts
Primate Road will be reduced to a single shared lane just west of Dixie Road. Where a single lane is shared with
oncoming traffic, please be sure to yield to oncoming traffic as stated by the road signs. These lanes will be
reopened from 7:00 a.m. to 7:00 p.m. daily.
Noise
We do not anticipate significant noise or vibrations above normal daytime construction levels during these
operations. Efforts will be made to reduce impacts to residents as much as possible.
Safety during construction
Construction zones require extra caution to keep everyone safe – pedestrians, cyclists, drivers, and construction
workers. When driving, walking, or biking through the construction area, please be aware of your surroundings,
watch for construction crews and other road users, slow down, account for delays, and consider other routes if
possible. To learn more about how to stay safe in construction zones, visit peelregion.ca/workzonesafety.
Thank you for your patience as we complete this necessary work. This work will allow us to continue providing
you with high quality tap water. If you have any questions, please contact us.
Water Linear Engineering
Engineering Services Division
Public Works, Peel Region
Email: construction@peelregion.ca
Phone: 905-791-7800 ext. 4409