Category

Ward 1

Residential Compassionate Flood Relief Grant Program applications now open

By Announcement, Issues, Resources, Stephen’s Initiatives, Ward 1

The one-time grant is available to eligible homeowners or tenants in Mississauga who had flood damage from the severe weather events in July and August 2024.

December 2, 2024

Today, the City of Mississauga launched its Residential Compassionate Flood Relief Grant, a one-time payment of $1,000 to affected property owners and tenants in Mississauga, who experienced basement flooding on July 16, August 17 and August 18. Residents can only apply for the grant once, even if they own more than one eligible property or experienced flooding on more than one day.

Who is eligible

To be eligible to apply for the Residential Compassionate Flood Relief Grant, you need to meet the following criteria:

  • Be an individual, not a corporation or business entity.
  • Be a registered owner or tenant of a residential dwelling within Mississauga.
  • Have experienced flood damage to your residence from the rainfall events on July 16, August 17 or August 18, 2024.

What you need to apply

Residents must complete a grant application and submit proof of eligibility, including proof of ownership or residence and proof of flooding.

To provide proof of ownership, you must provide a copy of your City tax bill. The name on the application must match the registered owner listed on the tax bill.

To provide proof of residence, if you are a tenant, you must show proof that you live at the eligible residence. You can provide:

  • Lease or rental agreement
  • Ontario driver’s license
  • Bank or credit card statement
  • Insurance policy
  • Utility, telephone or internet bill

All applicants must provide proof of flooding within a residential dwelling, such as:

  • Proof of an insurance claim made for flooding.
  • Correspondence with 311 Customer Service, a Councillor’s office or City staff.
  • Invoices, receipts or quotes for flood cleanup or repairs.
  • Photos of flooding in the residential dwelling, with the file’s metadata date stamped.

Applying online

Visit the webpage and upload the supporting documents, including proof of ownership or residence and proof of flooding.

Each file must be 5 MB or smaller and in one of the following formats: JPEG, JPG, PNG, GIF, PDF or WebP.

Applying by mail

Mail a completed Flood Relief Grant Application and supporting documents to the following address:

Residential Compassionate Flood Relief Grant Program
Transportation and Works
Environmental Services Section
300 City Centre Drive
Mississauga, ON L5B 3C1

For more information about the grant, residents are asked to call 311.

Applications will be accepted until May 31, 2025.

Important facts about stormwater

There are more than 51,000 storm drains in Mississauga, 1,900 km of storm sewer pipes, 270 km of ditches, 150 km of creeks, and 80 stormwater management facilities.

Valued at more than $7 billion, Mississauga’s stormwater drainage system requires constant care. Staff continue to assess and prioritize the most effective improvements to this aging infrastructure. Installing stormwater infrastructure requires a large investment up front, and it is expensive, but important to maintain.

Rebate programs

In February 2025, the City will be launching two additional rebate programs:

  • Basement Flooding Prevention Rebate Program will provide rebates up to $6,800 for eligible flood prevention improvements.
  • Flood Resilience Rebate Program will provide rebates of 50 per cent of the invoiced cost up to a maximum of $3,000 to cover costs associated with eligible measures taken to make improvements to your home to minimize flooding impact.

Other subsidies

Region of Peel Sanitary Backwater Valve Rebate (Current): The Region provides a $1,500 rebate for eligible homeowners to cover the cost of installing a sanitary backwater valve to reduce basement flooding due to sanitary back-ups of wastewater from the sanitary sewer. For more information, visit peelregion.ca.

Useful links

Read more about the City’s stormwater infrastructure.

Learn more about how to reduce the risk of flooding on your property.

Watch the City’s Flooding Information Session video.

Water Interruption Notice – C-603221, 696 and 700 Montbeck Crescent, Mississauga, Wednesday December 4

By Resources, Ward 1

The Peel Region Public Works department regularly maintains and repairs the water system to make sure you have a consistent supply of quality drinking water. Sometimes we must turn off your water supply while we do this work.

Your water will be turned off on Wednesday December 4th, 9:00am to 5:00pm. If we need to reschedule this work due to weather or other circumstances, we will let you know the new date and time.

Property owner/manager responsibilities during a water interruption

As a property owner/manager, it is your responsibility to:

  • Ensure maintenance, mechanical or plumbing staff are on site during the water interruption, as it may affect internal systems that rely on water such as boilers, fire suppression, and alarms.
  • Notify the fire alarm company if the interruption could affect an alarm system.
  • Have a fire watch completed during the water interruption, as the building’s sprinkler protection system will not function when the water supply is shut off.

After the water interruption

When we turn the water back on, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise. We recommend removing the air by slowly turning on your taps from the lowest to the highest faucet in the building (that is, starting in the basement/first floor, and finishing on the top floor). You will likely need to run the water for 10 to 30 seconds. Run the water until it is clear, and any vibration or noise has stopped.

Important note

After the water is turned back on, we recommend checking the water meter (usually located in the basement). If it is leaking, call Water Meter Installations Dispatch at:

  • 905-791-7800 extension 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
  • 905-791-7800 extension 4409 (after hours or statutory holidays)

If you have any questions, please contact us.

Construction Inspections

Engineering Technical Services Division

Operations Support, Public Works

Email: zzgetsdevadmin@peelregion.ca

Phone: 905-791-7800 extension 3246 / 3247 (8:30 a.m. to 4:00 p.m. – Monday to Friday)

Phone: 905-791-7800 extension 4409 (after hours or statutory holidays)

INTERRUPTION DETAILS

Date and Time: Wednesday December 4th, 9:00am to 5:00pm

Location:  696 and 700 Montbeck Cresent

Addresses Affected: 680 to 724 Montbeck Crescent

Project #:  C-603221

Regional Inspector: Phemelo Mpoloka

Telephone #    437-220-8917

 905-791-7800 ext. 3246/3247

Water Interruption Notice – C-603602, 172 Angelene St, Mississauga, Tuesday December 3rd

By Resources, Ward 1

The Peel Region Public Works department regularly maintains and repairs the water system to make sure you have a consistent supply of quality drinking water. Sometimes we must turn off your water supply while we do this work.

Your water will be turned off on Tuesday, December 3rd, 9:00am to 5:00pm. If we need to reschedule this work due to weather or other circumstances, we will let you know the new date and time.

Property owner/manager responsibilities during a water interruption

As a property owner/manager, it is your responsibility to:

  • Ensure maintenance, mechanical or plumbing staff are on site during the water interruption, as it may affect internal systems that rely on water such as boilers, fire suppression, and alarms.
  • Notify the fire alarm company if the interruption could affect an alarm system.
  • Have a fire watch completed during the water interruption, as the building’s sprinkler protection system will not function when the water supply is shut off.

After the water interruption

When we turn the water back on, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise. We recommend removing the air by slowly turning on your taps from the lowest to the highest faucet in the building (that is, starting in the basement/first floor, and finishing on the top floor). You will likely need to run the water for 10 to 30 seconds. Run the water until it is clear, and any vibration or noise has stopped.

Important note

After the water is turned back on, we recommend checking the water meter (usually located in the basement). If it is leaking, call Water Meter Installations Dispatch at:

  • 905-791-7800 extension 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
  • 905-791-7800 extension 4409 (after hours or statutory holidays)

If you have any questions, please contact us.

Construction Inspections

Engineering Technical Services Division

Operations Support, Public Works

Email: zzgetsdevadmin@peelregion.ca

Phone: 905-791-7800 extension 3246 / 3247 (8:30 a.m. to 4:00 p.m. – Monday to Friday)

Phone: 905-791-7800 extension 4409 (after hours or statutory holidays)

INTERRUPTION DETAILS

Date and Time: Tuesday December 3rd, 9:00am to 5:00pm

Location:  172 Angelene Street

Addresses Affected: 91 to 178 Angelene St

Project #:  C-603602

Regional Inspector: Phemelo Mpoloka

Telephone #   437-220-8917

905-791-7800 ext. 3246/3247

 

Water Interruption Notice – C-604044, 1619 Crediton Parkway, Mississauga, Thursday December 5

By Resources, Ward 1

The Peel Region Public Works department regularly maintains and repairs the water system to make sure you have a consistent supply of quality drinking water. Sometimes we must turn off your water supply while we do this work.

Your water will be turned off on Thursday December 5th, 9:00am to 5:00pm. If we need to reschedule this work due to weather or other circumstances, we will let you know the new date and time.

Property owner/manager responsibilities during a water interruption

As a property owner/manager, it is your responsibility to:

  • Ensure maintenance, mechanical or plumbing staff are on site during the water interruption, as it may affect internal systems that rely on water such as boilers, fire suppression, and alarms.
  • Notify the fire alarm company if the interruption could affect an alarm system.
  • Have a fire watch completed during the water interruption, as the building’s sprinkler protection system will not function when the water supply is shut off.

After the water interruption

When we turn the water back on, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise. We recommend removing the air by slowly turning on your taps from the lowest to the highest faucet in the building (that is, starting in the basement/first floor, and finishing on the top floor). You will likely need to run the water for 10 to 30 seconds. Run the water until it is clear, and any vibration or noise has stopped.

Important note

After the water is turned back on, we recommend checking the water meter (usually located in the basement). If it is leaking, call Water Meter Installations Dispatch at:

  • 905-791-7800 extension 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
  • 905-791-7800 extension 4409 (after hours or statutory holidays)

If you have any questions, please contact us.

Construction Inspections

Engineering Technical Services Division

Operations Support, Public Works

Email: zzgetsdevadmin@peelregion.ca

Phone: 905-791-7800 extension 3246 / 3247 (8:30 a.m. to 4:00 p.m. – Monday to Friday)

Phone: 905-791-7800 extension 4409 (after hours or statutory holidays)INTERRUPTION DETAILS

Date and Time: Thursday December 5th, 9:00am to 5:00pm

Location:  1619 Crediton Parkway

Addresses Affected: 1596 to 1649 Crediton Parkway

Project #:  C-604044

Regional Inspector: Phemelo Mpoloka

Telephone #   437-220-8917

905-791-7800 ext. 3246/3247

Upcoming Service Disruptions in December -Lakeshore West

By Announcement, Transit, Ward 1

We hope you are doing well as we get ready to celebrate the holiday season.

We would like to share some upcoming planned service adjustments and construction updates that will impact your community

Lakeshore West: Friday evening to Sunday, Nov. 29 -Dec. 1

From late evening on Friday Nov. 29 and throughout the weekend, there will be no GO Train service between Union Station and Oakville GO due to construction along Lakeshore West. GO Trains will run between Niagara Falls and Oakville GO with minor schedule adjustments.

There will be no GO Transit service at Exhibition, Mimico, Long Branch and Port Credit GO stations.

Long Branch GO will be closed throughout the weekend due to construction. During this time, the temporary pathway from Edgeware Drive will remain open, however, access to the north platform from the temporary pathway will be closed. There will be no access to the station or the parking lot from 11:59 p.m. on Nov. 29 to Dec. 2 5:00 a.m. Reserved parking spot owners who are affected will be notified.

Learn more.

Please check your schedules before you travel.

Lakeshore West: Saturday and Sunday, Dec. 7-8

  • All Lakeshore line train service will operate on an hourly schedule.
  • For those who normally connect from the Lakeshore East service to travel west, not all trains will continue past Union Station.
  • GO bus connection times will be adjusted.
  • There will be some late night service adjustments on December 6.

Lakeshore West: Saturday and Sunday, Dec. 14-15

  • All Lakeshore line train service will operate on an hourly schedule.
  • For those who normally connect from the Lakeshore East service to travel west, not all trains will continue past Union Station.
  • GO bus connection times will be adjusted.
  • There will be some late night service adjustments on December 13.

Lakeshore West: Saturday and Sunday, Dec. 21-22

  • All Lakeshore line train service will operate on an hourly schedule.
  • For those who normally connect from the Lakeshore East service to travel west, not all trains will continue past Union Station.
  • GO bus connection times will be adjusted.
  • There will be some late night service adjustments on December 20.

Postal Strike – Committee of Adjustment Notices for Ward 1 December 12th, 2024

By Announcement, Ward 1

The Committee of Adjustment (CoA) notices for the December 12, 2024 meetings were picked up by Canada Post, but due to the postal strike it is unlikely that residents would have received them.  The City has met the requirements of the Planning Act by posting the notices online on the Council and Committee Calendar, and additionally the (CoA) signs will be displayed for Consent Applications starting today and Minor Variances on Monday, December 2, 2024.

Please review the Committee of Adjustment notices and follow instructions if you wish to submit a letter of objection or support for an application.  Here are the links to each meeting on December 12th:

1:00pm 1063 Eastmount, 1404 Milton, 1634 Crestview

3:30pm 28 Mohawk, 1619 Crediton

Water Interruption Notice – C-602850, 2024 Harvest Drive, Mississauga, Thursday November 28th

By Resources, Ward 1

The Peel Region Public Works department regularly maintains and repairs the water system to make sure you have a consistent supply of quality drinking water. Sometimes we must turn off your water supply while we do this work.

Your water will be turned off on Thursday November 28th, 11:00am to 5:00pm. If we need to reschedule this work due to weather or other circumstances, we will let you know the new date and time.

Property owner/manager responsibilities during a water interruption

As a property owner/manager, it is your responsibility to:

  • Ensure maintenance, mechanical or plumbing staff are on site during the water interruption, as it may affect internal systems that rely on water such as boilers, fire suppression, and alarms.
  • Notify the fire alarm company if the interruption could affect an alarm system.
  • Have a fire watch completed during the water interruption, as the building’s sprinkler protection system will not function when the water supply is shut off.

After the water interruption

When we turn the water back on, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise. We recommend removing the air by slowly turning on your taps from the lowest to the highest faucet in the building (that is, starting in the basement/first floor, and finishing on the top floor). You will likely need to run the water for 10 to 30 seconds. Run the water until it is clear, and any vibration or noise has stopped.

Important note

After the water is turned back on, we recommend checking the water meter (usually located in the basement). If it is leaking, call Water Meter Installations Dispatch at:

  • 905-791-7800 extension 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
  • 905-791-7800 extension 4409 (after hours or statutory holidays)

If you have any questions, please contact us.

Construction Inspections

Engineering Technical Services Division

Operations Support, Public Works

Email: zzgetsdevadmin@peelregion.ca

Phone: 905-791-7800 extension 3246 / 3247 (8:30 a.m. to 4:00 p.m. – Monday to Friday)

Phone: 905-791-7800 extension 4409 (after hours or statutory holidays)

INTERRUPTION DETAILS

Date and Time: Thursday November 28th, 11:00am to 5:00pm

Location:  2024 Harvest Drive

Addresses Affected: 2024 to 2091 Harvest Dr

Project #:  C-602850

Regional Inspector: Phemelo Mpoloka

Telephone #   437-220-8917

905-791-7800 ext. 3246/3247

RESCHEDULED: FYI – 23-1310 D: Water Interruption Notice – Safeway Cres. & Sherway Dr. – Dec. 2/24

By Resources, Ward 1

For the watermain construction project 23-1310 D, residents will experience interruptions to their water supply on Monday December 2nd, 2024 between 9 a.m. and 5 p.m.  Approximately 24 houses will be affected at:

  • 1461 to 1508 Safeway Crescent
  • 1462 to 1479 Sherway Drive

This was originally scheduled for Thursday November 28th, 2024.

Other information about this construction project is available online at https://peelregion.ca/construction/project-23-1310-d

Please send any questions to construction@peelregion.ca .  This will allow our customer service team to direct the inquiry to the relevant staff and log it to inform future service enhancements.

Armory Lands Soil Remediation

By Announcement, Planning & Development, Ward 1

There is some work taking place in the park next to GE Booth. Starting this morning (November 25, 2024), Region of Peel have a contractor setting up to take soil samples in preparation for remediation. The general area is shown in the image below. This work should take about three weeks to complete.

  1. Peel Region is doing environmental soil investigation work in preparation for the community revitalization and master plan work planned for south Mississauga.
  2. Local residents and businesses will not be impacted and the Mississauga Waterfront trail will remain open during the work.
  3. Trail users should use caution and reduce speed when workers are present.
  4. Trail users are asked to remain on the paved portion of the trail during the work. Please do not cross any temporary barriers.

 

 

Water Interruption Notice – C-603626, 913 Aviation Rd, Mississauga, Friday November 29th

By Resources, Ward 1

The Peel Region Public Works department regularly maintains and repairs the water system to make sure you have a consistent supply of quality drinking water. Sometimes we must turn off your water supply while we do this work.

Your water will be turned off on Friday November 29th, 9:00am to 5:00pm. If we need to reschedule this work due to weather or other circumstances, we will let you know the new date and time.

Property owner/manager responsibilities during a water interruption

As a property owner/manager, it is your responsibility to:

  • Ensure maintenance, mechanical or plumbing staff are on site during the water interruption, as it may affect internal systems that rely on water such as boilers, fire suppression, and alarms.
  • Notify the fire alarm company if the interruption could affect an alarm system.
  • Have a fire watch completed during the water interruption, as the building’s sprinkler protection system will not function when the water supply is shut off.

After the water interruption

When we turn the water back on, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise. We recommend removing the air by slowly turning on your taps from the lowest to the highest faucet in the building (that is, starting in the basement/first floor, and finishing on the top floor). You will likely need to run the water for 10 to 30 seconds. Run the water until it is clear, and any vibration or noise has stopped.

Important note

After the water is turned back on, we recommend checking the water meter (usually located in the basement). If it is leaking, call Water Meter Installations Dispatch at:

  • 905-791-7800 extension 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
  • 905-791-7800 extension 4409 (after hours or statutory holidays)

If you have any questions, please contact us.

Construction Inspections

Engineering Technical Services Division

Operations Support, Public Works

Email: zzgetsdevadmin@peelregion.ca

Phone: 905-791-7800 extension 3246 / 3247 (8:30 a.m. to 4:00 p.m. – Monday to Friday)

Phone: 905-791-7800 extension 4409 (after hours or statutory holidays)

INTERRUPTION DETAILS 

Date and Time: Friday November 29th, 9:00am to 5:00pm

Location:  913 Aviation Rd

Addresses Affected: 885 to 918 Aviation Rd

Project #:  C-603626

Regional Inspector: Phemelo Mpoloka

Telephone #  437-220-8917

905-791-7800 ext. 3246/3247