Category

Ward 1

SCHEDULED WATER INTERRUPTION NOTICE – May 17 – Benson Avenue

By Resources, Ward 1

INTERRUPTION DETAILS

Date and Time:         Wednesday, May 17 from 8:00 a.m. to 12:00 p.m. 

Location:                    Benson Avenue                                   

Addresses Affected:  Benson Avenue                                   

Project #:                   T-17004Ma

Regional Inspector:  John Sadore

Telephone #               905-791-7800 ext. 3246/3247

The Region of Peel Public Works department regularly maintains and repairs the water system to make sure you have a consistent supply of quality drinking water. Sometimes we must turn off your water supply while we do this work.

Your water will be turned off on Wednesday, May 17 from 8:00 a.m. to approximately 12:00 p.m. If we need to reschedule this work due to weather or other circumstances, we will let you know the new date and time.

If this interruption may affect an alarm or maintenance company, it is your responsibility to notify them.  During the time that the water supply is interrupted, the building’s sprinkler protection system will not function.  A fire watch should be performed as necessary during time period.

After the water interruption:

When we turn the water back on, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise.  We recommend removing the air by slowly turning on your taps from the lowest to the highest faucet in the building (that is, starting in the basement/first floor and finishing on the top floor). Flush the toilets as well. You will likely need to run the water for 10 to 30 seconds.  Run the water until it is clear, and any vibration or noise has stopped.

Important note:  After the water is turned back on, we recommend checking your water meter (usually located in the basement).  If it is leaking, call Water Meter Installations Dispatch at:

  • (905) 791 – 7800 Ext. 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
  • (905) 791 – 7800 Ext. 4409 (After hours or Statutory Holidays)

Message from Councillor Stephen Dasko Regarding Lakeview Community Partners – MZO

By Issues, Planning & Development, Ward 1

Councillor Dasko is very disturbed by the Province’s decision to approve a MZO (Minister’s Zoning Order) for the Lakeview development which was released late afternoon on Friday, May 12, 2023.

The Councillor has since been interviewed by the press sharing his concerns on this matter. CP24

An excerpt of the Councillor’s comments is below as well.

But the city councillor that represents the Lakeview area says that by unilaterally doubling the size of the development, the Ford government is undoing planning work for the site that dates back to 2006.

“We had a very comprehensive report saying that this is a bad idea, that you don’t want to do this and we were sending that back to the ministry and copying the minister on this when we got absolutely blindsided at 5 p.m. on a Friday going into Mother’s Day weekend,” he said. “It’s devastating. The infrastructure concerns weren’t taken to account and the vision of this has not been taken into account. We went from a mid-rise development to essentially the sky’s the limit with removing height caps and things like that. So this has changed the trajectory and what this was and is intended (for the area) dramatically.”

The government has said that it will continue to work with stakeholders “to facilitate approvals and ensure the realization of tangible community benefits.”

Dasko, however, said that he feels like the city will now have to “start at square one,” with some of the planning work, as the intended vision for the neighbourhood has been “completely upended.”

He also said that he fears a planned two-kilometre bus rapid transit line along Lakeshore Road East will be insufficient to accommodate the thousands of new residents along Mississauga’s lakeshore.

“Planning was always predicated on that 8,000 units since this was put forward as a master plan community. So that’s what people were working on up at the region and also at the city in terms of pipes in the ground for somebody that wants to have a drink of water or flush a toilet. All of these things were always based on those types of numbers,” he said. “To say I am disappointed, devastated would be an understatement.”

As originally planned, the Councillor insisted that the Planning and Development Committee meeting go ahead tonight to discuss this issue.  Please see the report that was prepared to review as well as the link to the Committee meeting this evening below:

  1. Report: https://link.edgepilot.com/s/f89becb0/navdCOEnik_y_Ta68_7BEg?u=https://pub-mississauga.escribemeetings.com/FileStream.ashx?DocumentId=40264
  2. Link to Planning and Development meeting – Monday, May 15, 2023 @ 6:00 p.m. https://www.mississauga.ca/council/council-activities/council-and-committee-videos/live-council-and-committee-videos/

SCHEDULED WATER INTERRUPTION NOTICE – Benson Avenue, May 15, 2023

By Resources, Ward 1

The Region of Peel Public Works department regularly maintains and repairs the water system to make sure you have a consistent supply of quality drinking water. Sometimes we must turn off your water supply while we do this work.

INTERRUPTION DETAILS:

Date and Time:         Monday, May 15 from 9:00 a.m. to 5:00 p.m.

Location:                    Benson Avenue                              

Addresses Affected:  Benson Avenue                                

Project #:                   T-17004Ma

Your water will be turned off on Monday, May 15 from 9:00 a.m. to approximately 5:00 p.m. If we need to reschedule this work due to weather or other circumstances, we will let you know the new date and time.

If this interruption may affect an alarm or maintenance company, it is your responsibility to notify them.  During the time that the water supply is interrupted, the building’s sprinkler protection system will not function.  A fire watch should be performed as necessary during time period.

After the water interruption:

When we turn the water back on, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise.  We recommend removing the air by slowly turning on your taps from the lowest to the highest faucet in the building (that is, starting in the basement/first floor and finishing on the top floor). Flush the toilets as well. You will likely need to run the water for 10 to 30 seconds.  Run the water until it is clear, and any vibration or noise has stopped.

Important note:  After the water is turned back on, we recommend checking your water meter (usually located in the basement).  If it is leaking, call Water Meter Installations Dispatch at:

  • (905) 791 – 7800 Ext. 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
  • (905) 791 – 7800 Ext. 4409 (After hours or Statutory Holidays)

The regional inspector is John Sedore and he can be reached at 905-791-7800 ext. 3246/3247

Project #T-17004Ma

SCHEDULED WATER INTERRUPTION NOTICE – Water Interruption Notice – 892 Johnathan Dr., Mississauga – May 17, 2023

By Resources, Ward 1

The Region of Peel Public Works department regularly maintains and repairs the water system to make sure you have a consistent supply of quality drinking water. Sometimes we must turn off your water supply while we do this work.

INTERRUPTION DETAILS

Date and Time:         Wednesday, May 17, 2023, from 9:00am to 5:00pm

Location:                    892 Johnathan Drive                       

Addresses Affected:  861 to 930 Johnathan Drive, 2197 to 2208 Breezy Brae Drive, 2217 to 2218 Candish Lane, Mississauga

Project #:                   C-602934

Your water will be turned off on   Wednesday, May 17th, 2023, from approximately    9:00 a.m. to 5:00 p.m.     If we need to reschedule this work due to weather or other circumstances, we will let you know the new date and time.

If this interruption may affect an alarm or maintenance company, it is your responsibility to notify them.  During the time that the water supply is interrupted, the building’s sprinkler protection system will not function.  A fire watch should be performed as necessary during time.

After the water interruption:

When we turn the water back on, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise.  We recommend removing the air by slowly turning on your taps from the lowest to the highest faucet in the building (that is, starting in the basement/first floor and finishing on the top floor). Flush the toilets as well. You will likely need to run the water for 10 to 30 seconds.  Run the water until it is clear, and any vibration or noise has stopped.

Important note:  After the water is turned back on, we recommend checking your water meter (usually located in the basement).  If it is leaking, call Water Meter Installations Dispatch at:

  • (905) 791 – 7800 Ext. 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
  • (905) 791 – 7800 Ext. 4409 (After hours or Statutory Holidays)

 

The regional inspector is John Sedore and he can be reached at 905-791-7800 ext. 3246/3247

Project # C-602934

“We Are Resilient” Exhibit – St. Lawrence Park – on now until August 7, 2023

By Events, Parks, Ward 1

Come out to see the “We are Resilient” exhibit – a travelling exhibition that was recently installed at St. Lawrence Park. The exhibit is designed to engage residents, and help us learn more about climate change and actions we can take to help combat it.

This exhibition has already travelled to Community Common Park, City Hall, and UTM and will stay at St. Lawrence Park until August 7, 2023.

Take in the exhibit while you stroll along beautiful Lake Ontario. The exhibit showcases compelling photographs and stories from Mississauga residents, perspectives from international scientific leaders, and ways you can take climate action today!

For more information please visit: www.mississauga.ca/we-are-resilient

Where: St. Lawrence Park, 75 St Lawrence Drive, Mississauga, ON L5G 4V3

When: Now until August 7, 2023

Bus Stop Impacts – (#0221 and #0222) Eastbound Lakeshore Road between Pine Avenue and Mississauga Road

By Resources, Ward 1

Please be advised of the following 2 bus stop relocation’s along eastbound Lakeshore Road between Pine Avenue and Mississauga Road due to servicing and restoration works:

Stop #0221 on EB Lakeshore Road at Benson Avenue will be out of service from Tuesday May 9 until Friday June 16.  Patrons will be directed to the previous stop #0218 at Maple Avenue which is 225 metres away.  Stop #0221 is serviced by Route 23E with continued accessible bus service at stop #0218.

Stop #0222 on EB Lakeshore Road, east of Benson Avenue will be out of service from Tuesday May 9 until Friday June 16.  Patrons will be directed the next stop #0223 at Mississauga Road which is 200 metres away.  Stop #0222 is serviced by Route 23E with continued accessible bus service at stop #0223.

Scheduled Water Interruption Notice – May 9 – 1028 Orchard Road, Mississauga

By Resources, Ward 1

SCHEDULED WATER INTERRUPTION NOTICE

 

INTERRUPTION DETAILS

Date and Time:         Tuesday, May 9, 2023, from 09:00 a.m. to 05:00 p.m.

Location:                    1028 Orchard Road, Mississauga               

Addresses Affected1201 Lakeshore Road E, Orchard Rd

Project #:                   C-603118

Regional Inspector:  John Sedore

Telephone #               905-791-7800 ext. 3246/3247

 

The Region of Peel Public Works department regularly maintains and repairs the water system to make sure you have a consistent supply of quality drinking water. Sometimes we must turn off your water supply while we do this work.

Your water will be turned off on   Tuesday, May 9, 2023, from approximately    09:00 a.m. to 05:00 p.m.     If we need to reschedule this work due to weather or other circumstances, we will let you know the new date and time.

If this interruption may affect an alarm or maintenance company, it is your responsibility to notify them.  During the time that the water supply is interrupted, the building’s sprinkler protection system will not function.  A fire watch should be performed as necessary during time.

After the water interruption:

When we turn the water back on, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise.  We recommend removing the air by slowly turning on your taps from the lowest to the highest faucet in the building (that is, starting in the basement/first floor and finishing on the top floor). Flush the toilets as well. You will likely need to run the water for 10 to 30 seconds.  Run the water until it is clear, and any vibration or noise has stopped.

Important note:  After the water is turned back on, we recommend checking your water meter (usually located in the basement).  If it is leaking, call Water Meter Installations Dispatch at:

  • (905) 791 – 7800 Ext. 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
  • (905) 791 – 7800 Ext. 4409 (After hours or Statutory Holidays)

 

Shaun Hussain

Foreperson, Construction Inspections

Engineering Technical Services

Operations Support Division

Public Works

2 Copper Road, Brampton ON, L6T 4W5

(905) 791-7800 Ext. 3309

Notification – EAB (Emerald Ash Borer) Removals at Dellwood Park

By Parks, Ward 1

City contracted crews will be working to remove ash trees infested with Emerald Ash Borer (EAB) in Dellwood Park.

Crews will be working Monday to Friday from 8 a.m. to 5 p.m. starting the week of May 8, 2023. Crews will be removing EAB trees around the perimeter of the woodlot within striking distance of residents’ private property and along striking distance of sanctioned pathways throughout the woodlot.

All works will be weather permitting and are expected to be completed the week of May 23, 2023.

Forestry is currently working on plans to replant woodlots.  Each woodlot is unique and will require additional work to create individual plans for each site.