Category

Ward 1

Lakeview Discovery Centre Artist-In-Residence Series – Final Community Art Workshop May 31, 4-7 pm

By Events, Ward 1

Please join the final community art workshop at Lakeview Village, Mississauga that is part of The Discovery Centre Artist-In-Residence Series, on May 31st (4pm-7pm), in partnership with Artscape Atelier.

This workshop is led by an Indigenous artists Pandora Wilhelm, who will be sharing her knowledge and creating language puzzles with participants to celebrate the many diverse languages spoken by families in the community. This workshop is geared to families (children recommended age 12 and younger) with their adult caregivers.

Eventbrite link for signing up: https://bit.ly/4369ii4

Instagram: HERE

Facebook: HERE

Public Meeting – Planning and Development Committee – 1407 Lakeshore Road East, north of Lakeshore Road East, east of Cherriebell Road

By Planning & Development, Ward 1

In Person and Virtual Public Meeting
RECOMMENDATION REPORT NOTICE

Meeting Date and Time:
Monday, June 12, 2023 at 6:00 p.m.
Meeting Place:
Mississauga Civic Centre, Council Chamber, 300 City Centre Drive
Applicant’s Proposal:
1407 Lakeshore Road East, north of Lakeshore Road East, east of Cherriebell Road
Application submitted by: 1407 Lakeshore Developments Inc.
File: OZ/OPA 22-13 W1

The applicant is proposing to change the official plan and zoning to permit a 9 storey apartment building with ground floor commercial space.

Meeting Details:

This meeting will be held in person and online. Advance registration is required to make a verbal submission at the meeting virtually. Advance registration is preferred to make a verbal submission at the meeting in person. The proceedings will be streamed live online for the public to view at the following link: http://www.mississauga.ca/portal/cityhall/council-and-committee-videos. If you wish to phone in to listen to the meeting only, please call 905-615-3200, ext. 5423 for instructions.

Options for participating in the meetings are outlined below.

Purpose of Meeting:
The City held a Public Meeting on August 8, 2022. At the upcoming meeting, Planning and Building staff will present a report addressing issues raised and will provide a recommendation on the proposal. Planning and Development Committee will make a decision about this project at this meeting.
The report will be available on-line one week prior to the meeting at: http://www.mississauga.ca/portal/cityhall/planninganddevelopment

For detailed information contact:
City Planner David Ferro at 905-615-3200 ext. 4554 or david.ferro@mississauga.ca

If you would like to share your views and/or you wish to be notified of further meetings or be added to the mailing list, please contact the Planning and Building Department by Friday at 4:00 p.m. prior to the meeting date:
• by mail to 300 City Centre Drive, 6th floor, Mississauga ON L5B 3C1
• by email to application.info@mississauga.ca
• please include your name, your address, and application number or address of the property you are providing comments on.

Written Comments:
In order to be received by Committee at the public meeting, written comments must be received no later than Friday at 4:00 p.m. prior to the meeting date. Submissions are accepted by email at deputations.presentations@mississauga.ca or by mailing the Planning and Development Committee, 300 City Centre Drive, 2nd Floor, Mississauga, ON L5B 3C1. Please include your name, your address, and application number or address of the property you are providing comments on. Written comments received before, during or after a public meeting but before a by-law is passed receive the same consideration as verbal comments made during a public meeting.

How to participate in a public meeting if you wish to make verbal submissions:

Participate Virtually
Advance registration is required to participate and/or make comment virtually at the public meeting. Please email deputations.presentations@mississauga.ca no later than Friday at 4:00 p.m. prior to the meeting date. Any materials you wish to show the Committee during your presentation must be provided as an attachment to the email. Links to cloud services will not be accepted. You will be provided with directions on how to participate from Clerks’ staff.

Residents without access to the internet can participate and/or make comment in the meeting via telephone. To register, please call Angie Melo at 905-615-3200 ext. 5423 no later than Friday at 4:00 p.m. prior to the meeting date. You must provide your name, phone number, and application number if you wish to speak to the Committee. You will be provided with directions on how to participate from Clerks’ staff.

Participate In Person
To make a verbal submission in person, advance registration is preferred. Please email deputations.presentations@mississauga.ca no later than Friday at 4:00 p.m. prior to the meeting date.

If you are a landlord, please post a copy of this notice where your tenants can see it. We want to make sure they have a chance to take part.

Background Studies:
Planning documents and background material available at: http://www.mississauga.ca/portal/residents/development-applications.
Contact the city planner noted above for more information.

Personal Information:
Individuals should be aware that any personal information in their verbal or written communication will become part of the public record, unless the individual expressly requests the City to remove the personal information. Questions about the collection of this information may be directed to application.info@mississauga.ca or in writing to the Planning and Building Department at 300 City Centre Drive, Mississauga ON L5B 3C1.

Information about Appeals:
If a person or public body does not make oral submissions at a public meeting or make written submissions to the City before the by-law is passed, the person or public body is not entitled to appeal the decision of City Council to the Ontario Land Tribunal, or be added as a party to an appeal of the decision to the Tribunal.

The proposed Official Plan amendment is exempt from approval by the Region of Peel. The decision of City Council is final if a notice of appeal is not received on or before the last day for filing a notice of appeal.

Date of Notice: May 18, 2023

Shop local at Mississauga’s only indoor and outdoor farmers’ Market! Sundays – May 28-October 29

By Events, Ward 1

The Lakeview Farmers’ Market is held indoors and outdoors at the Small Arms Inspection Building, with live music from local buskers, a cafe, a bi-weekly Artisan Market, special community activities, and much more.

The Lakeview Farmers’ Market features local, sustainable, organic, and artisanal products, which provide an important source of income for local farmers, growers, producers, and artisans. Take the opportunity to connect with those who grow and produce the food that ends up on your plate! 

Check back weekly for details on additional Market activities and vendor lineups. https://www.creativehub1352.ca/lakeviewfarmersmarket 

Lakeview Innovation District Community Improvement Plan (CIP) – Survey Results

By Planning & Development, Ward 1

What We Heard
Two surveys, one for residents and one for industry, were open from April 4 to 21, 2023 on the
Lakeview Innovation District CIP website (https://yoursay.mississauga.ca/lakeview-innovation-district).

The surveys aimed to gather feedback on providing incentives to industries locating in the Innovation
District.

For full survey results, click here.

Next Steps
The survey results were considered in preparing the draft CIP that will be presented for comment. The following steps are required to adopt and activate the CIP:

• May 29, 2023 – Planning and Development Committee Public Meeting to consider the draft CIP

This meeting will be held in person and online.
Advance registration is required to participate and/or make a comment at the meeting virtually.
Advance registration is preferred to participate and/or make a comment in the meeting inperson. To register, please email deputations.presentations@mississauga.ca or call 905-615-
3200 ext. 4915 no later than the Friday prior to the meeting.
The proceedings will be streamed live online for the public to view at the following link:
http://www.mississauga.ca/portal/cityhall/council-and-committee-videos.
• June 14, 2023 – City Council meeting to adopt a By-law to implement the CIP
• 20-day appeal period
• CIP in force and effect after appeal period and resolution of any appeals, if applicable

Comments and feedback are invited at the Public Meeting (registration details above) as well as anytime prior to City Council adoption of the CIP by contacting:

Melissa Slupik, Project Lead
Planner, Planning Innovation, City Planning Strategies
Phone 1-905-615-3200 x 5152
Email melissa.slupik@mississauga.ca
Mail Melissa Slupik, City Planning Strategies, 7th FL – Planning and Building, City of Mississauga, 300 City Centre Drive, Mississauga, ON L5B 3C1

SCHEDULED WATER INTERRUPTION NOTICE – May 24 – 14 Front St S, Mississauga

By Resources, Ward 1

INTERRUPTION DETAILS

Date and Time:         Wednesday, May 24th, 2023, from 09:00 a.m. to 05:00 p.m

Location:                    14 Front St S, Mississauga              

Addresses Affected10-42 Front St South

Project #:                   C-602991

Regional Inspector:  John Sedore

Telephone #               905-791-7800 ext. 3246/3247

The Region of Peel Public Works department regularly maintains and repairs the water system to make sure you have a consistent supply of quality drinking water. Sometimes we must turn off your water supply while we do this work.

Your water will be turned off on Wednesday, May 24th, 2023, from approximately 09:00 a.m. to 05:00 p.m. If we need to reschedule this work due to weather or other circumstances, we will let you know the new date and time.

If this interruption may affect an alarm or maintenance company, it is your responsibility to notify them.  During the time that the water supply is interrupted, the building’s sprinkler protection system will not function.  A fire watch should be performed as necessary during time.

After the water interruption:

When we turn the water back on, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise.  We recommend removing the air by slowly turning on your taps from the lowest to the highest faucet in the building (that is, starting in the basement/first floor and finishing on the top floor). Flush the toilets as well. You will likely need to run the water for 10 to 30 seconds.  Run the water until it is clear, and any vibration or noise has stopped.

Important note:  After the water is turned back on, we recommend checking your water meter (usually located in the basement).  If it is leaking, call Water Meter Installations Dispatch at:

  • (905) 791 – 7800 Ext. 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
  • (905) 791 – 7800 Ext. 4409 (After hours or Statutory Holidays)

 

SCHEDULED WATER INTERRUPTION NOTICE – May 25 – 1279 Alexandra Avenue, Mississauga

By Resources, Ward 1

INTERRUPTION DETAILS

Date and Time:         Thursday, May 25th, 2023, from 09:00 a.m. to 05:00 p.m.

Location:                    1279 Alexandra Avenue, Mississauga                    

Addresses Affected1302-1255 Alexandra Avenue

Project #:                   C-603233

Regional Inspector:  John Sedore

Telephone #               905-791-7800 ext. 3246/3247

 

The Region of Peel Public Works department regularly maintains and repairs the water system to make sure you have a consistent supply of quality drinking water. Sometimes we must turn off your water supply while we do this work.

Your water will be turned off on Thursday, May 25th, 2023, from approximately 09:00 a.m. to 05:00 p.m.  If we need to reschedule this work due to weather or other circumstances, we will let you know the new date and time.

If this interruption may affect an alarm or maintenance company, it is your responsibility to notify them.  During the time that the water supply is interrupted, the building’s sprinkler protection system will not function.  A fire watch should be performed as necessary during time.

After the water interruption:

When we turn the water back on, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise.  We recommend removing the air by slowly turning on your taps from the lowest to the highest faucet in the building (that is, starting in the basement/first floor and finishing on the top floor). Flush the toilets as well. You will likely need to run the water for 10 to 30 seconds.  Run the water until it is clear, and any vibration or noise has stopped.

Important note:  After the water is turned back on, we recommend checking your water meter (usually located in the basement).  If it is leaking, call Water Meter Installations Dispatch at:

  • (905) 791 – 7800 Ext. 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
  • (905) 791 – 7800 Ext. 4409 (After hours or Statutory Holidays)

 

SCHEDULED WATER INTERRUPTION NOTICE – Watermain Replacement and Improvement 1541 and 1547 Hurontario Street – May 18

By Hurontario LRT, Resources, Ward 1

INTERRUPTION DETAILS

Date: Thursday May 18th, 2023

Time: 8:00 pm. to 6:00 a.m.

Location: 1541 and 1547 Hurontario Street Ward 1, City of Mississauga

Affecting: Approximately 1 Pharmacy and 3 Commercial Units affected

Project no.: 16-1390

Project Manager: Jay Christy

Telephone: (437) 339-3945

The Region of Peel Public Works department regularly maintains and repairs the water system to make sure you have a consistent supply of quality drinking water. Sometimes we must turn off your water supply while we do this work.

Your water will be turned off on Thursday May 18th, 2023, between 8 p.m. and 6 a.m. If we need to reschedule this work due to weather or other circumstances, we will let you know the new date and time.

Property owner/manager responsibilities during a water interruption

As a property owner/manager, it is your responsibility to:
•Ensure maintenance, mechanical or plumbing staff are on site during the water interruption, as it mayaffect internal systems that rely on water such as boilers, fire suppression, and alarms.
•Notify the fire alarm company if the interruption could affect an alarm system.
•Have a fire watch completed during the water interruption, as the building’s sprinkler protection systemwill not function when the water supply is shut off.

After the water interruption
When we turn the water back on, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise. We recommend removing the air by slowly turning on your taps from the lowest to the highest faucet in the building (that is, starting in the basement/first floor, and finishing on the top floor). You will likely need to run the water for 10 to 30 seconds. Run the water until it is clear, and any vibration or noise has stopped.

Important note
After the water is turned back on, we recommend checking the water meter (usually located in the basement). If it is leaking, call Water Meter Installations Dispatch at:
•905-791-7800, extension 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
•905-791-7800 extension 4409 (after hours or statutory holidays)

Sign up for email notices
Receive timely project updates right to your inbox by signing up for e-notices at peelregion.ca/construction

Keeping you informed
We will let you know if there are any major changes to the plans.

Thank you for your patience as we complete this necessary work. This work will allow us to continue providing you with high quality tap water.
If you have any questions, please contact us.

Water Linear Engineering
Engineering Services Division
Public Works, Region of Peel
Email: construction@peelregion.ca
Phone: 905-791-7800 ext. 4409