Category

Ward 1

17th Annual Walk The Walk for The Compass

By Events, Ward 1
Saturday September 16th at 8:30am 

This is a fun community event to help raise funds to support our South Mississauga neighbours who are experiencing food insecurity and homelessness.

Event includes 3 routes to choose from – 1k, 5k, or 10k.

Start and end at Church of St. Mark – Lutheran 130 Mineola Rd East.

Complimentary BBQ, Kid Zone, music, games and more.

SCHEDULED WATER INTERRUPTION NOTICE – Tuesday, August 1st, 2023, from 9:00 a.m. to 5:00 p.m. – 1046 & 1048 Roosevelt Rd     

By Resources, Ward 1

INTERRUPTION DETAILS

Date and Time:         Tuesday, August 1st, 2023, from 9:00 a.m. to 5:00 p.m.

Location:                    1046 & 1048 Roosevelt Rd                                  

Addresses Affected:  1015-1080 Roosevelt Rd, 363 Lakeshore Rd E                          

Project #:                   C- 601855

Regional Inspector:  John Sedore

Telephone #               416-706-1114 Ext 3246/47

The Region of Peel Public Works department regularly maintains and repairs the water system to make sure you have a consistent supply of quality drinking water. Sometimes we must turn off your water supply while we do this work.

Your water will be turned off on Tuesday, August 1st, 2023, from approximately 9:00 a.m. to 5:00 p.m. If we need to reschedule this work due to weather or other circumstances, we will let you know the new date and time.

If this interruption may affect an alarm or maintenance company, it is your responsibility to notify them.  During the time that the water supply is interrupted, the building’s sprinkler protection system will not function.  A fire watch should be performed as necessary during time.

After the water interruption:

When we turn the water back on, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise.  We recommend removing the air by slowly turning on your taps from the lowest to the highest faucet in the building (that is, starting in the basement/first floor and finishing on the top floor). Flush the toilets as well. You will likely need to run the water for 10 to 30 seconds.  Run the water until it is clear, and any vibration or noise has stopped.

Important note:  After the water is turned back on, we recommend checking your water meter (usually located in the basement).  If it is leaking, call Water Meter Installations Dispatch at:

  • (905) 791 – 7800 Ext. 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
  • (905) 791 – 7800 Ext. 4409 (After hours or Statutory Holidays)

SCHEDULED WATER INTERRUPTION NOTICE – Thursday, July 27th, 2023, from 10:00 p.m. to Friday, July 28, 2023, 1:00 a.m. – 15 Front St S   

By Resources, Ward 1

INTERRUPTION DETAILS

Date and Time:         Thursday, July 27th, 2023, from 10:00 p.m. to Friday, July 28, 2023, 1:00 a.m.

Location:                    15 Front St S                                  

Addresses Affected:  10-42 Front St S

Project #:                   C- 603389

Regional Inspector:  John Sedore

Telephone #               416-706-1114 Ext 3246/47

The Region of Peel Public Works department regularly maintains and repairs the water system to make sure you have a consistent supply of quality drinking water. Sometimes we must turn off your water supply while we do this work.

Your water will be turned off on Thursday, July 27th, 2023, from 10:00 p.m. to Friday, July 28, 2023, 1:00 a.m. If we need to reschedule this work due to weather or other circumstances, we will let you know the new date and time.

If this interruption may affect an alarm or maintenance company, it is your responsibility to notify them.  During the time that the water supply is interrupted, the building’s sprinkler protection system will not function.  A fire watch should be performed as necessary during time.

After the water interruption:

When we turn the water back on, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise.  We recommend removing the air by slowly turning on your taps from the lowest to the highest faucet in the building (that is, starting in the basement/first floor and finishing on the top floor). Flush the toilets as well. You will likely need to run the water for 10 to 30 seconds.  Run the water until it is clear, and any vibration or noise has stopped.

Important note:  After the water is turned back on, we recommend checking your water meter (usually located in the basement).  If it is leaking, call Water Meter Installations Dispatch at:

  • (905) 791 – 7800 Ext. 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
  • (905) 791 – 7800 Ext. 4409 (After hours or Statutory Holidays)

 

 

WATER INTERRUPTION NOTICE Watermain Replacement and Improvement Star Academy School at 1587 Cormack Crescent – Wednesday July 26th,2023

By Resources, Ward 1

INTERRUPTION DETAILS

Date: Wednesday July 26th,2023

Time: 5:00 p.m. to 9:00 p.m.

Location: Star Academy School at 1587 Cormack Crescent Ward 1, City of Mississauga

Affected: Approximately 1 private school affected

Project No.: 22-1395

Project Manager: Frank Pugliese

Telephone: (905) 867-6437

The Region of Peel Public Works department regularly maintains and repairs the water system to make sure you have a consistent supply of quality drinking water. Sometimes we must turn off your water supply while we do this work.

Your water will be turned off on Wednesday July 26th, 2023 between 5 p.m. and 9 p.m. If we need to reschedule this work due to weather or other circumstances, we will let you know the new date and time.

Property owner/manager responsibilities during a water interruption

As a property owner/manager, it is your responsibility to:
•Ensure maintenance, mechanical or plumbing staff are on site during the water interruption, as it mayaffect internal systems that rely on water such as boilers, fire suppression, and alarms.
•Notify the fire alarm company if the interruption could affect an alarm system.
•Have a fire watch completed during the water interruption, as the building’s sprinkler protection systemwill not function when the water supply is shut off.

After the water interruption
When we turn the water back on, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise. We recommend removing the air by slowly turning on your taps from the lowest to the highest faucet in the building (that is, starting in the basement/first floor, and finishing on the top floor). You will likely need to run the water for 10 to 30 seconds. Run the water until it is clear, and any vibration or noise has stopped.

Important note
After the water is turned back on, we recommend checking the water meter (usually located in the basement). If it is leaking, call Water Meter Installations Dispatch at:
•905-791-7800, extension 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
•905-791-7800 extension 4409 (after hours or statutory holidays)

Sign up for email notices
Receive timely project updates right to your inbox by signing up for e-notices at peelregion.ca/construction

Keeping you informed
We will let you know if there are any major changes to the plans.

Thank you for your patience as we complete this necessary work. This work will allow us to continue providing you with high quality tap water.
If you have any questions, please contact us.

Water Linear Engineering
Engineering Services Division
Public Works, Region of Peel
Email: construction@peelregion.ca
Phone: 905-791-7800 ext. 4409

Indigenous Art Along the Waterfront

By Parks, Ward 1
Artwork along the waterfront will form a public art trail of works by Indigenous artists. This will include permanent public artworks, murals on buildings near the waterfront and the use of natural materials in public art installations.

Mississauga’s waterfront shoreline along Lake Ontario measures approximately 22 kilometres and extends west from Toronto towards Oakville. While there is Indigenous art located throughout the city, the shoreline of Lake Ontario provides rich opportunities to celebrate and honour Indigenous peoples, their culture, history and ongoing stewardship of the lands and waters.

A new webpage has been launched, and you can find it here.  The content includes an introductory section about the art trail as well as an “About the Curator” section featuring Philip Cote who is working with members of the Mississauga’s of the Credit First Nation and the City’s public art program on this project.

Hazel McCallion Line Construction Updates

By Hurontario LRT, Ward 1

Mississauga South

Work is progressing along Hurontario in Misssisauga! Keep up to date with what is happening and where:

Stormwater Relocation Work – New
Watermain connections between LSW and Mineola Road – Ongoing
Traffic Staging Southbound Lanes – Ongoing
Utility Relocations & Roadworks Mississauga South – Ongoing

Progress on the Hazel McCallion Line
Port Credit residents will see significant progress on the construction of the Hazel McCallion Line around their neighbourhood’s GO station:

Mary Fix Creek has been undergoing a transformative revitalization as part of the Hazel McCallion Line project and is nearing completion.

Work crews are reconstructing 400 metres of the creek bed, which is vital to preventing floods and erosion. To date, around 325 metres are complete, with the remainder expected to be finished this year.

Read more about the Mary Fix Creek revitalization and updates to Port Credit GO at metrolinx.com

To get updates and stay informed, please subscribe now.

Notice of Bus Stop Impact: #0331 – SB Hurontario St at Indian Valley Trail | UPDATE Wednesday, July 19, 2023

By Hurontario LRT, Ward 1

Stop(s) Impacted:  No. 0331: SB Hurontario St at Indian Valley Trail

Temporary Stop Location:

0305 – SB Hurontario St south of Indian Valley Trail (190m south)

0329 – SB Hurontario St at Pinetree Way (320m north)

Routes Impacted: 2 South

Date and Time: Wednesday, July 19, 2023 @ 7:00am

Estimated Duration: until Friday, July 21, 2023 @ 10:00 pm

Event Type: HuLRT

Agency: Mobilinx

Notes:

–             Stops will remain accessible;

–             No detours required.

 

Should there be any questions/concerns, please contact: MiWay.Infrastructure@mississauga.ca.

 

WATER INTERRUPTION NOTICE -Thursday July 20th at 9 p.m. to Friday July 21st,2023 at 7 a.m. Watermain Replacement and Improvement 1077 to 1125 North Service Road

By Resources, Ward 1

INTERRUPTION DETAILS

Date: Thursday July 20th to Friday July 21st, 2023

Time: 9:00 p.m. to 7:00 a.m.

Location: 1077 to 1125 North Service Road

Affected: Approximately 1 Commercial/Industrial Unit affected

Project No.: 22-1395

Project manger: Frank Pugliese

Telephone: (905) 867-6437

The Region of Peel Public Works department regularly maintains and repairs the water system to make sure you have a consistent supply of quality drinking water. Sometimes we must turn off your water supply while we do this work.

Your water will be turned off from Thursday July 20th at 9 p.m. to Friday July 21st,2023 at 7 a.m. If we need to reschedule this work due to weather or other circumstances, we will let you know the new date and time.

Property owner/manager responsibilities during a water interruption

As a property owner/manager, it is your responsibility to:
•Ensure maintenance, mechanical or plumbing staff are on site during the water interruption, as it mayaffect internal systems that rely on water such as boilers, fire suppression, and alarms.
•Notify the fire alarm company if the interruption could affect an alarm system.
•Have a fire watch completed during the water interruption, as the building’s sprinkler protection system will not function when the water supply is shut off.

After the water interruption
When we turn the water back on, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise. We recommend removing the air by slowly turning on your taps from the lowest to the highest faucet in the building (that is, starting in the basement/first floor, and finishing on the top floor). You will likely need to run the water for 10 to 30 seconds. Run the water until it is clear, and any vibration or noise has stopped.

Important note
After the water is turned back on, we recommend checking the water meter (usually located in the basement). If it is leaking, call Water Meter Installations Dispatch at:
•905-791-7800, extension 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
•905-791-7800 extension 4409 (after hours or statutory holidays)

Keeping you informed
We will let you know if there are any major changes to the plans.

Thank you for your patience as we complete this necessary work. This work will allow us to continue providing you with high quality tap water.

If you have any questions, please contact us.

Water Linear Engineering
Engineering Services Division
Public Works, Region of Peel
Email: construction@peelregion.ca
Phone: 905-791-7800 ext. 4409

National Drowning Prevention Week – Free Swim July 19th

By Events, Ward 1

This week, through to July 22nd, we are recognizing National Drowning Prevention Week by welcoming residents for a free swim on Wednesday July 19th at select pools across the City.

Staff will be on site delivering drowning prevention messages, information, handouts, colouring sheets, fun activities and more to help educate families about the importance of water safety.

According to the Lifesaving Society, over 400 Canadians die in preventable water-related incidents annually. Making a splash at pools, lakes, rivers, beaches should be positive experience for everyone and water safety is essential.

Free swims will take place on Wednesday July 19th at the following locations and times: 

Don McLean Westacres Outdoor Pool

1:10 p.m. to 4 p.m.

Lions Club of Credit Valley Outdoor Pool

1:45 p.m. to 4:45 p.m.