Starting Monday, Oct. 23, there will be MiWay service changes that include service improvements and reductions based on customer demand, and updated schedules on several routes to improve service reliability based on increased traffic volumes.
MiWay ridership is at an all-time high and this growth continues to put pressure on the transit network capacity. MiWay continues to adjust routes and service frequencies to ensure that services remain responsive to evolving customer demand based on the resources available.
Saturday service resumes on Route 101 Dundas Express
To provide additional service capacity along the Dundas corridor, the Route 101 Dundas Express will resume Saturday service and operate every 21 minutes throughout the day. This increase in service is due to consistently high customer demand on Route 1 Dundas on weekends.
Service improvements due to increasing customer demand
The routes below will provide more frequent service based on ridership growth:
- 4 Sherway Gardens: will operate every 34 minutes on weekdays from 2 pm to 6 pm.
- 22 Finch: will operate every 22 minutes on Saturdays from 12 pm to 7 pm.
- 66 McLaughlin: will operate every 21 minutes on Saturdays from 11 am to 10 pm. On Sundays, it will operate every 20 minutes from 10 am to 8 pm.
- 107 Malton Express: will operate every 13 minutes on weekdays from 2 pm to 7 pm.
Service reductions due to low customer demand
MiWay is reducing service on the routes below due to low ridership and reinvesting the savings back into busier routes to address overcrowding and reliability issues for customers.
- 4 Sherway Gardens: will operate every 59 minutes on weekdays after 6 pm.
- 20 Rathburn: will operate every 45 minutes on weekdays from 7 pm to 10 pm. On Saturdays, it will operate every 35 minutes before 10 am and after 7 pm.
- 23 Lakeshore: will operate every 27 minutes on weekdays from 7 pm to 10 pm.
- 25 Traders Loop: this route will operate on weekdays from 6 am to 6 pm.
- 39 Britannia: will operate every 32 minutes on weekdays from 10 am to 1:30 pm.
Schedule adjustments
Schedules will be updated on various routes to improve service reliability (a complete list of routes will be available on miway.ca).
Learn more about these service changes and the MiWay 5 service plan benefits at miway.ca.
An artist-run collective art show that will be held in one location at the Small Arms Inspection Building on
October 21-22, 2023
Saturday 10-5 pm, Sunday 10-4 pm
The Trail has historically featured local visual artists exhibiting their artworks out of their studios or local businesses located throughout the scenic Mississauga villages of Clarkson, Port Credit and Lorne Park. This highly anticipated art show has changed its venue, but remains true to the spirit of the show.
Find out more at https://www.lakeshorearttrail.com/
A pro forma is a fundamental analysis tool used by condo developers to determine whether to proceed with a project. It involves specifying project details such as unit count, square footage, and average unit size, along with essential financial components like gross residential revenue, net residential revenue, total project revenue, project costs (including both hard and soft costs), and net profit. Ultimately, developers utilize the pro forma to gauge the potential profitability of their project through a preliminary estimate.
- When looking at purchasing a site, developers tend to work backwards to determine how much they should pay for property.
- Developers who assume higher densities in their pro forma will often pay more for a site.
- Hard costs associated with construction have escalated over last few years and municipalities have minimal control over these.
- Municipal growth related charges such as development charges and parkland dedication are used to pay for new infrastructure to support growth. Costs for the construction of municipal infrastructure has also increased in recent years.
- Other soft costs include consulting, architectural, sales commissions and similar expenses.
- Unit sale prices are determined by the market.
INTERRUPTION DETAILS
Date and Time: Thursday, October 5th from 9:00 am to 5:00 pm
Location: 768 Montbeck Cres
Addresses Affected: 733-771 Montbeck Cres
Project #: C-601328
Regional Inspector: Phemelo Mpoloka
Telephone # 437-220-8917 ext. 3246/3247
The Region of Peel Public Works department regularly maintains and repairs the water system to make sure you have a consistent supply of quality drinking water. Sometimes we must turn off your water supply while we do this work.
Your water will be turned off on Thursday, October 5th from approximately 9:00 am to 5:00 pm. If we need to reschedule this work due to weather or other circumstances, we will let you know the new date and time.
If this interruption may affect an alarm or maintenance company, it is your responsibility to notify them. During the time that the water supply is interrupted, the building’s sprinkler protection system will not function. A fire watch should be performed as necessary during time period.
After the water interruption:
When we turn the water back on, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise. We recommend removing the air by slowly turning on your taps from the lowest to the highest faucet in the building (that is, starting in the basement/first floor and finishing on the top floor). Flush the toilets as well. You will likely need to run the water for 10 to 30 seconds. Run the water until it is clear, and any vibration or noise has stopped.
Important note: After the water is turned back on, we recommend checking your water meter (usually located in the basement). If it is leaking, call Water Meter Installations Dispatch at:
- (905) 791 – 7800 Ext. 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
- (905) 791 – 7800 Ext. 4409 (After hours or Statutory Holidays)
INTERRUPTION DETAILS
Date and Time: Tuesday, October 3rd from 9:00 am to 5:00 pm
Location: 1077 Fourth St
Addresses Affected: 1052-1089 Fourth St; 1139 Strathy Ave
Project #: C-603108
Regional Inspector: Phemelo Mpoloka
Telephone # 437-220-8917 ext. 3246/3247
The Region of Peel Public Works department regularly maintains and repairs the water system to make sure you have a consistent supply of quality drinking water. Sometimes we must turn off your water supply while we do this work.
Your water will be turned off on Tuesday, October 3rd from approximately 9:00 am to 5:00 pm. If we need to reschedule this work due to weather or other circumstances, we will let you know the new date and time.
If this interruption may affect an alarm or maintenance company, it is your responsibility to notify them. During the time that the water supply is interrupted, the building’s sprinkler protection system will not function. A fire watch should be performed as necessary during time period.
After the water interruption:
When we turn the water back on, air in the pipes may make the water cloudy and your plumbing may vibrate or make noise. We recommend removing the air by slowly turning on your taps from the lowest to the highest faucet in the building (that is, starting in the basement/first floor and finishing on the top floor). Flush the toilets as well. You will likely need to run the water for 10 to 30 seconds. Run the water until it is clear, and any vibration or noise has stopped.
Important note: After the water is turned back on, we recommend checking your water meter (usually located in the basement). If it is leaking, call Water Meter Installations Dispatch at:
- (905) 791 – 7800 Ext. 3226 (8:30 a.m. to 4:30 p.m. – Monday to Friday)
- (905) 791 – 7800 Ext. 4409 (After hours or Statutory Holidays)
Peel Region would like to invite you to attend a Public Information Centre (PIC) to learn about a proposed reservoir expansion at the Arthur P. Kennedy Water Treatment Plant located at 920 East Avenue, Mississauga.
The PIC will take place on:
October 18, 2023
(Drop-in Centre Format)
6:30 pm to 8 p.m.
Saint Dominic Separate School 515 Hartsdale Ave, Mississauga ON L5G2G7
Ontario’s First Women’s and Children’s Hospital Announced in Mississauga
Highly specialized health care services closer to home for women, children and families in Mississauga and West Toronto
Trillium Health Partners (THP) and the Government of Ontario are advancing health care and health promotion, by building Ontario’s first Women’s and Children’s Hospital. By focusing on women, children, and equity-deserving groups, THP will provide one-of-a-kind services and integrated care that will improve generational health in Mississauga and West Toronto.
THP has been on a mission to create a new kind of health care for a healthier community since being established in 2011. Today, it is one of Canada’s largest and most innovative integrated health care organizations, combining the strength and expertise of multiple hospital sites and over 15,000 people to serve one of the world’s most diverse communities. Now, THP is taking another giant leap forward by investing in the health of women, children and families and the health of the entire community by establishing the Women’s and Children’s Hospital.
Located within the future home of The Peter Gilgan Mississauga Hospital, this 200,000-square-foot facility will be equipped with cutting-edge technology, designed to provide the highest standards of care in Maternal and Newborn Health, Children’s Health and Women’s Health. The Women’s and Children’s Hospital will be purpose-built for families, offering an array of highly specialized services, integrated care and health system partnerships that will profoundly impact the generational health of the community, from conception, through infancy and childhood, and into all phases of adulthood.
Key features of the Women’s and Children’s Hospital include:
• A full suite of highly specialized reproductive, gynecological and children’s health services for all people, focused on reducing health inequity and nurturing diversity.
• Dedicated mental health inpatient beds for children and youth – a first for the region.
• Expert care for pregnancies and births, including those that are high-risk, with modern labour and birthing suites for parents and families.
• A Neonatal Intensive Care Unit (NICU) with including specially-designed couplet care suites to accommodate parents and babies staying together.
• Access to state-of-the-art surgical suites to accommodate specialized procedures closer to home.
• Family-centred care that stretches throughout all areas of the hospital and includes gender-neutral washrooms, breastfeeding areas and a dedicated paediatric zone in the emergency department.
• Excellent patient and family experience with access to highly-trained specialists.
“The new hospital will be the first-of-its-kind in Ontario, expanding and improving care for women and children from across Mississauga,” said Premier Doug Ford. “Right across the province, we’re making historic investments in health care, adding new beds and reducing wait times. We’re working to ensure everyone in Ontario has access to convenient care close to home.”
The new Women’s and Children’s Hospital will build upon the strengths of THP’s legacy regional Women’s and Children’s program to enhance THP’s wide range of services and partnerships across the health care continuum and support better health outcomes for families and communities. The new hospital will offer innovative care models and be a place that reimagines how women and children receive care to ensure the whole person is supported, while caring for complex medical and mental health conditions.
“Our government is taking bold and innovative action to connect Ontarians to the care they need, closer to home,” said Sylvia Jones, Deputy Premier and Minister of Health, “By partnering with THP to create the first-of-its-kind Women’s and Children’s Hospital, we are ensuring patients in Mississauga can have access the specialized services they need, when they need it, for years to come.”
“This is a historical announcement for THP that puts people and our community at the centre of creating a healthier future”, said THP President and CEO Karli Farrow. “Focusing on women, children and families is foundational to building a more equitable health system for all. We look forward to working with our partners and community to ensure all people, including all gender identities, feel safe and represented at this Women’s and Children’s Hospital, and at THP overall.”
“Everyone deserves better health and confidence that the health system is working for them” said Dipika Damerla, Mississauga City Councillor, Ward 7. “This announcement is a game changer in the building of a healthier, more equitable, and thriving Mississauga.”
This groundbreaking initiative, combined with state-of-the-art facilities and integration with community care and services, is expected to attract the world’s best health care providers, medical specialists, researchers, and talent to Mississauga and West Toronto. As a result, THP and the communities served will become an even more sought-after place to work, live, and raise families.
Today’s announcement builds on THP’s long-term infrastructure plan, Trillium HealthWorks, which is designed to address the rising demand for health care services in Mississauga and West Toronto. The new hospital is currently in the design phase and patients will continue to access care at THP through the emergency departments. Work is underway now to expand and improve services to create an integrated system of care for women and children that will continue deliver high quality care when construction is complete.
Get tips and learn about the different signals and road markings that promote more pedestrian-friendly streets.
Contact us
If you have any questions about pedestrian crossovers or signals, or want to report a pedestrian signal on a City road that’s not working properly, please call 311 (905-615-4311 outside City limits).
If you have a question or concern about a pedestrian signal on a regional road, please contact the Region of Peel.
What can we do to reduce the rates of Diabetes in Mississauga?
We want to hear from you
The City is looking to hear from as many community members and businesses as possible. Your input is critical to the success of this strategy.
Survey: Complete the online survey before Thursday, November 30, 2023.
The City will also engage in conversations with various communities throughout Mississauga, focusing on those with an increased risk of type 2 diabetes. A health equity lens will be applied to ensure the needs of those most impacted by diabetes are considered, which would support changes that will benefit all citizens.
The City will work with the community, industry, agency and government partners to understand Mississauga’s unique type 2 diabetes challenges, identify community needs and priorities, build the strategy and determine the action plan.
Visit the City of Mississauga’s type 2 diabetes online engagement site for more details and to sign up for project updates.